Installing Plant and Systems (Pipefitting)
Level 3
Awarded by Engineering Construction Industry Training Board
Accredited from 14 August 2003 to 30 August 2008
Group award number: G78C 23
Standards
This SVQ is based on standards developed by Engineering Construction Industry Training Board (ECITB). ECITB represent a wide variety of people working in a broad range of occupations within the Engineering Construction Industry.
Structure of the SVQ
The way the SVQ is made up is shown below. The unit title appears in bold and the elements that make up each unit are listed under the unit title.
Mandatory units
Candidates must complete all of these units:
Shape Pipework Components by Material Removal Using Hand Tools
1Shape pipework components by material removal using hand tools
Assemble Pipework Components to Meet Specification
1Assemble pipework components to meet specification
Contribute to Effective Working Relationships
1Contribute to effective working relationships
Work Safely, Minimize Risk and Comply with Emergency Procedures
1Work safely, minimize risk and comply with emergency procedures
Identify and Deal with Hazards in the Work Environment
1Identify and deal with hazards in the work environment
Optional units
Candidates must also complete 5 of the following units (Candidates must achieve one of the units with a * plus 4 other units – which can include whichever unit with a * that hasn’t been chosen), in addition to the mandatory units:
* Position and Install Pipework
1Position and install pipework
Mark Out to the Required Specification
1Mark out to the requires specification
Establish Compliance of an Engineering Installation with the Specification
1Establish compliance of an engineering installation with the specification
Prepare Work Areas for the Installation of Pipework
1Prepare work areas for the installation of pipework
Prepare Materials Required for Pipework Installation
1Prepare materials required for pipework installation
Prepare Equipment for Pipework Installation
1Prepare equipment for pipework installation
Reinstate the Work Area after Completing the Installation of Pipework
1Reinstate the work area after completing the installation of pipework
Store Pipework Installation Related Resources for Further Use
1Store pipework installation related resources for further use
* Test the Performance and Condition of Installed Pipework
1Test the performance and condition of installed pipework
Shape Pipework Components by Manually Applied Pressure
1Shape pipework components by manually applied pressure
Contexts
The award can be taken in 3 different contexts. The contexts and group award numbers are listed below:
Installing Plant and Systems (Pipefitting)
Installing Plant and Systems (Instrument Pipefitting)
Installing Plant and Systems (Mechanical)
There may be publications available to support this SVQ. For more information, please contact
Engineering Construction Industry Training Board
Blue Court
Church Lane
Kings Langley
Herts
WD4 8JP
Tel: 01923 260000
Fax: 01923 270969
Website:
Installing Plant and Systems (Pipefitting)/3/26/05/2003/KS