SUPPLEMENTARY CONDITIONS
MODIFICATION TO GENERAL CONDITIONS
1.0 None (add any modifications to the General Conditions here):
ADDITIONAL CONDITIONS
2.0 Stated Allowances
2.1 The Contractor shall include within the Basis of GMP the cash allowances listed in Section 00 _5200 – -“GMP Supporting Documents” - Attachment B.
2.2 The Contractor shall purchase the "Allowed Items" as directed by the Owner through the Architect/Engineer on the basis of the lowest and best bid of at least three competitive bids. Unless specified by the Construction Documents otherwise, if the actual price for purchasing the "Allowed Items" is more or less than the "Cash Allowance," the Contract Price shall be adjusted accordingly (see Subparagraph 3.8.2.3 in General Conditions). The adjustment in Contract Price shall be made on the basis of the purchase price without additional charges for overhead, profit, insurance, or any other incidental expenses. The total cost of installation of the "Allowed Materials" shall be included in the Base Bid or Alternates as appropriate.
3.0 ENERGY STAR®
3.1 This Project is designed to achieve an EPA ENERGY STAR rating of 75 or higher. The Design Professional has filed a Statement of Energy Design Intent, generated from Target Finder, with the U.S. EPA. The Contractor shall cooperate with the Design Professional and Owner in matters related to verifying the energy performance of the completed Project.
INSTRUCTIONS:
The State Minimum Wage Rate Determination and related documents issued for this specific project shall be inserted on this page.
NOTE: Not required if project is less than $60,000 (effective June 17, 2005)
Insert Wage Rate Determination here
SUPPLEMENTARY CONDITIONS 00 7300 - 2
CMAR_v.1.1_5.23.11