01 3310 SUBMITTAL PROCEDURES - Attachment A
A. Submittal List
1. Construction schedule, subcontractor list, contact phone numbers, and schedule of values.
2. Submittal list based on this attachment.
3. Permit copies.
4. Aerial Spacer Cable Systems
5. Wooden Poles
6. Medium voltage cable
7. Conduit and fittings
8. Low voltage cable
9. Metering
10. Generator connection cabinet
11. Manual transfer switch
12. Conduit and Wire
13. Disconnect Switch
14. Pullboxes
15. Wireways
16. Disconnect switches
B. Documents required in Purchasing provisions, such as MBE plan, bonds, insurance certificates, etc., are in addition to these requirements.
END OF ATTACHMENT