ANNEX 1: LOGICAL FRAMEWORK

LOGFRAME PLANNING MATRIX FOR PROJECT / Programme name and number
Unallocated Special Envelope Transition Facility
“Support for setting up an efficient National Preventive Mechanism for an increased promotion and protection of human rights in the places of detention” / Contracting period expires
15.12.2009 / Disbursement period expires
15.12.2010
Total budget:
MEURO 0.213 / TF budget
MEURO 0.2
Overall objective / Relates to Copehagen criterion and Acquis chapter / List of other projects with same objective
Increasing promotion and protection of human rights within detention places / Commission Decision 2006/928/EC of 13 December 2006 establishing a mechanism for cooperation and verification of progress in Romania to address specific benchmarks in the areas of judicial reform. / - PHARE Twinning Project 2004/016-772.01.06 – „Further improvement of the penitentiary system”
- TF Twinning 2007/19343.01.08 “Assistance for enhancing the respect of human rights in prisons and improving the efficiency of the Romanian penitentiary system”
- Human Rights Training in Romanian Prisons project, part of the Re-united Europe program, developed by Penal Reform International from Romania and financed by the United Kingdom’s Embassy in Bucharest
Project purpose / Objectively Verifiable Indicators / Sources of Verification / Assumptions
Establishing the most suitable solutions for implementing a national prevention mechanism for preventing torture and other cruel, inhuman or degrading treatment orpunishmentin all detention places. / The law establishing the organisation and functioning of a „national prevention mechanism” elaborated. / The law elaborated
Project reports
International organisations and NGO reports. / No delays in starting the project.
National budget resources available.
Close cooperation between the Twinning partners.
Interest, commitment and receptiveness of the Romanian professionals inidentifying suitable solutions for implementing a national prevention mechanism for preventing torture and other cruel, inhuman or degrading treatment or punishment in all detention places.
Absence of unforeseeable major obstacles beyond the control of the Project which could potentially hinder work-progress as scheduled.
Results / Objectively Verifiable Indicators / Sources of Verification / Assumptions
A fact finding mission performed and a report elaborated concerning the necessary aspects for the setting up the “national preventive mechanisms” at the level of beneficiary. / - 2 round tables organised
- report comprising the conclusions of the roundtables elaborated. / Attendance lists
Project reports / National budget resources available.
Availability and regular presence of the Romanian participants at the organized events.
Readiness of the Romanian participants to cooperate with their EU counterparts.
A final report, comprising a comparative study from at least two MS that already implemented such a mechanism as well as of recommendations on feasible solutions for implementing the “national preventive mechanism” elaborated and approved by the beneficiary. / - a written description of selected “national preventive mechanisms” elaborated
-2 workshops organised
- a final report comprising acomparative study as well recommendations on the most feasible solutions for implementing the national prevention mechanism in Romania elaborated / Attendance lists
Project reports / Proper collaboration between the MS experts and relevant involved Romanian institutions in elaborating the report.
Availability and regular presence of the Romanian participants in the workshops.
Proper identification by the MS experts of relevant different national prevention mechanisms
Activities / Means / Assumptions
Activities under Result 1
1.1. Organising 2 consultation meetings (round tables) with representatives of the relevant institutions, bodies of the Beneficiary country having a key part in the setting up of the mechanism as well as in the further elaboration of the legal framework for establishing the “national prevention mechanism”for determining the key aspects necessary for its well-functioning (for example: how to guarantee the independence of these preventive mechanisms, their organisational structure, the needed qualifications of the personnel, etc.), considering the specificity of the Romanian human rights protection system. / Twinning Light contract. / Attendance lists
Project Reports / National budget resources available.
Availability and regular presence of the Romanian participants at the organized events.
Readiness of the Romanian participants to cooperate with their EU counterparts.
1.2Elaboration, by the MS experts,of a report on the state of play, based on thee meetings and information put at theirr disposal by the institutions in charge with the setting up of the „national preventive mechanism” in Romania. / Twinning Light contract / Report elaborated within the activity
FinalProject Report / Proper collaboration between the MS experts and relevant involved Romanianrepresentatives in collectingthe necessary data for the report
Proper identification by the MS experts of the state of play in Romania.
Activities under Result 2
2. 1 Elaborate a written description of selected “national preventive mechanisms” functioning at the level of at least 2 Member States, comprising the legal and institutional framework and focusing on presenting relevant aspects of their functioning (for example: the regulatory framework, the structure, the number and qualification of personnel, the ways of achieving its mission). The exact key aspects the written description will comprise will be agreed with the Romanian partner. / Twinning Light contract / Written description elaborated
Final Project Report / Proper identification by the MS experts of relevant different national prevention mechanisms
2.2. Organise workshops with representatives of all the stakeholders in the field (representatives of the relevant ministries, of the National Administration of Penitentiaries, representatives of the civil society - 2 workshops of 2 days, of about 20 participants each) in order to discuss possible solutions for the implementation in the Romanian system of the national prevention mechanism, considering also the previously elaborated written description of selected “national preventive mechanisms”. / Twinning Light contract / Attendance lists
Final Project Report / National budget resources available.
Availability and regular presence of the Romanian participants at the organized events.
Readiness of the Romanian participants to cooperate with their EU counterparts.
2.3. Elaborate a final report, comprising a comparative study of selected “national preventive mechanism” functioning at the level of at least 2 Member States.
The comparative study will be informed by activity 2.1 and will comprise a strengths and weaknesses analysis of the systems presented, with a view of adapting/using them as models for Romania.
The report will also provide recommendations on the most feasible solutions for implementing the “national preventive mechanism”in Romania,taking also into considerations the conclusions of the comparative study, and will be discussed for fine-tuning with the beneficiary. The report will be submitted for approval to the beneficiary. / Twinning Light contract / Report elaborated within the activity
Final Project Report / Proper collaboration between the MS experts and relevant involved Romanian institutions in elaborating the report.
Most adequate solution for implementing the national preventive mechanism in Romania identified and agreed on.

Annex 2 - DETAILED TIME IMPLEMENTATION CHART FOR THE PROJECT

2008 / 2009 / 2010
S / O / N / D / J / F / M / A / M / J / J / A / S / O / N / D / J / F / M / A / M / J / J / A / S / O / N / D
Twinning Light
contract / D / D / D / D / C / C / I / I / I / I / I / I

Legend:

D = design

C = contracting

I = implementation

R = review

X = closure

Annex 3 -CUMULATIVE CONTRACTING AND DISBURSEMENT SCHEDULE

All figures in million EURO

30/08/2009 / 31/10/2009 / 30/11/2009 / 31/12/2010 / 30/06/2010
CONTRACTED
Twining / 0.2 ME
DISBURSED
Twining / 0.16 ME / 0.2 ME