United Nations

International Strategy for Disaster Reduction

Disaster Inventory Management System: DesInventar

TRAINING AGENDA

Day 1. General Concepts and Introduction to Disaster data analysis

9:00 –9:10Workshop Opening

9:10–9:20Goals and objectives of the workshop

9:20 –10:00Introduction to Disaster theory

10:00–10:15 Tea/ Coffee Break

10:15 –10:45General Background

Hyogo Framework for Action

Risk Assessments

National Disaster Databases and Inventories

10:45 – 11:30 Presentation of the Global Assessment Report GAR

11:30–11:40Introduction to DesInventar

The basic Disaster Data Card

Data Collection Methodology

11:40 – 12:45Fundamentals of DesInventar Methodologies

Common concepts and Definitions

Geography

Events & Causes

Effects

Recommendations & How To’s

12:45 - 14:00 Lunch

14:00 - 14:15 Overview of DesInventar Server system: Environment, modules, tabbed interface

14:15 - 14:30The Analysis module “DesConsultar”: overview

14:30 - 16:45. Working with and interpreting Country Profiles(Preliminary Analysis Methodology)

-Composition analysis

Tea/ Coffee Break

-Temporal Analysis

-Spatial analysis

-Statistical summaries

Brief presentation of Analysis Methodologies:

Preliminary Analysis Methodology

Intensive/Extensive Risk Analysis (Global Assessment Report)

Historical Risk Index Methodology

Empirical Loss Exceedance curves

Day 2. Detailed analysis of Disaster data

9:00– 9:30. The Query Window and Basic Query Results (“View Data”)

9:30- 9:45 The Map Window

Zooming and Selecting

Considerations about the Mapping functionality of DI Server

Obtaining maps for DesInventar

9:45– 12:30 Charting results

Composition Analysis: comparatives

Tea/ Coffee Break

Temporal Analysis: Histograms (simple, geographical, by event)

Seasonal Charts

12:30 – 13:30 Lunch

13:30 – 14:30Thematic Mapping

Spatial Analysis

Types of legends

Automated Generation of Ranges

Variables

14:30 – 14:45 Report Generation (Exporting data to excel)

14:45 – 15:15 Statistics Generation

Totalization levels

Statistical measures

Crosstabs

15:15 – 15:30 Tea/ Coffee Break

15:30 – 16:45 Practice with Analysis tool (DesConsultar Module)

Case studies with Nepal/Mozambique/Mali databases

Day 3Data entry process

9:00 – 9:15DesInventar Server Admin Screens: introduction

9:15 – 10:00 Events Management

Causes Management

Geography

Levels

Maintenance

Maps

Baseline data

10:00– 10:15Tea/ Coffee

10:15– 11:15DataCard operations: data entry, adding editing and deleting data cards

Query Screen in Edit mode

Quality control techniques

11:15 – 12:00 Detailed DesInventar Methodology

Catalog of events

Causes

Effects

Data Sources

Validation

Disaggregation

Long duration Events

Good practices (metadata, etc.)

12:00- 12:30Introduction to Extension of Data Cards

Variables

Tabs

12:30 – 14:00 Lunch

14:00 – 16:00 Practice session/ Visit to information/data archive.

16:00 – 16:30 Wrap-up and concluding the Group Training

List of materials disseminated during the workshop

(Available in Arabic and English) and online at and

  1. Concept Paper: Building Disaster Inventories
  2. Methodology: Building Disaster Inventory through DesInventar
  3. User-Manual for DesInventar and DesConsultar Software
  4. Installation Guide DesInventar Server 9
  5. Configuration Guide DesInventar Server 9
  6. USB with DesInventar Server Software (Versions 9.12) and soft copies of the above documents
  7. PowerPoint DesInventar Presentation
  8. PowerPoint Training Guidelines

OPTIONAL: Day 4 System administration (Project team and national coordination focal points)

9:00 - 9:30 Installation and basic configuration of a DesInventar Server

9:30 – 10:00 General Administration

Region Management

System Parameters

Data import:

Importing data from DesInventar MS Access databases

Importing data from other DesInventar regions (consolidation)

Importing data from Excel

Importing/Exporting data in XML format

  • 10:00 – 10:30 Security
  • Definition of Users
  • Privilege levels
  • Permissions
  • 10:30 – 11:15 Maintenance perspectives
  • New versions
  • Bug reporting

11:15 – 12:00 Update, Monitor and Coordination

12:00 – 13:00Next steps and plan forward

1