Standard Operating Procedure
Cressington 108 Auto Sputter Coater
Contents
Overview
Operations
Targets Available
Troubleshooting/FAQs
Contact
About this document
Overview
The Cressington 108 Auto Sputter Coater is used for coating samples with a thin layer of a conductive metal film. These layers are typically used to dissipate electrical charge from non-conductive samples placed in SEMs and e-beam writing tools. Our tool sputter deposits a fine grained AuPd alloy compatible with high resolution SEM imaging. We also have pure Au targets available for installation upon request.
Note:You must be qualified by a staff member to use this tool.
Operations
- Enable tool on Badger –this will turn on the N2 and Ar gas flows
- The chamber should start venting.
- Open the lid and place your sample on the holder
- To start pumping, turn on power switch at lower left
- Press top plate firmly against glass cylinder during the initiation of pumping
- The system should be in Auto Mode
- Press CYCLE in the Auto Mode box to start a deposition cycle
- It will pump out the chamber, flush with Ar, re-pump, and leak Ar into the chamber and then start the plasma.
- Press Zero on the Thickness Monitor Controller once it pumps down. This will zero the thickness monitor reading for a new film
- Watch the thickness on the Monitor controller.
- A film thickness of 3-5 nm is desirable for SEM discharging.
- When the desired thickness is reached press PAUSE in the Auto Mode box
- Note: The maximum thickness allowed in this machine is 25nm.
- Then press CYCLE to end the deposition process, let it pump down.
- Turn off the power switch to vent the chamber.
- Remove your sample
- Turn the power switch back on to pump the chamber.
- Disable the tool on Badger
- Turn off the:
- Power switch on the system.
- Power switch on the Thickness Monitor Controller Box
Targets Available:
- Default Target: Au/Pd (20/80) gives best grain size for SEM imaging
- Au targets available on request:
- 99.99% Au
- 99.999% Au
Troubleshooting/FAQs
If encountering a problem, send an email to the tool contact.
Contact
Cliff Knollenberg /About this document
1.0 / 04/20/2017 / Cliff Knollenberg / Initial DocumentWe encourage everyone to contribute to this document. Please follow these steps to integrate your comments/additions/suggestions:
- Save this file to your computer
- Turn on the “track-changes” feature in Word
- Make your comments/additions/suggestions and save the file
- Email the finished document to the contact indicated above
Cressington Sputter Coaterv1.04/20/2017