CONTRACT NUMBER: 28 MAY 2009

CONTRACT SECTIONS B-M

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited

3

CONTRACT NUMBER: 12 Nov 2012

SECTION B Supplies or Services and Prices

SECTION B - SUPPLIES OR SERVICES AND PRICES

ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0001 /

TBD

/ Set
Pilot Production Operational Test Program Sets
FFP – Design, Fabricate, Integrate, Manufacture, Test and Deliver Pilot Production Operational Test Program Sets (OTPSs) IAW the State of Work and OTPS specification
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0002 / 1.0 / Lot
Data for Item 0001
FFP – (See Exhibit A)
______
NET AMT / NSP
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0003 / 1.0 / Lot
Pilot Production Acceptance Test (PPAT) for Item 0001
FFP - (Contractor Testing)
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0004 / 1.0 / Lot
Pilot Production Approval Test Report
FFP – Pilot Production Approval Test Report for CLIN 0003
(See Exhibit B)
______
NET AMT / NSP
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0005 / 1.0 / Lot
Administrative and Financial Data for Item 0001
FFP – (See Exhibit C)
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0006 / 1.0 / Lot
ILS Data for Item 0001
FFP – (See Exhibit D)
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0007 / 1.0 / Lot
Technical Manuals for Item 0001
FFP – (See Exhibit E)
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0008 / 1.0 / Lot
OPSEC Plan for Item 0001
FFP – (See Exhibit F)
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0009
Interim Spares
FFP – Interim Repairable Assemblies and Repair Parts for Item 0001.
(SEE NOTE 2) Quantity and Pricing to be determined. This CLIN is
“To Be Determined” and will be negotiated upon final acceptance of the Critical Design Review.
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0010
Data for Item 0009
FFP – (See Exhibit “XX”) (NOTE 2) Quantity and Pricing to be determined. This CLIN is “To Be Determined” and will be negotiated upon final acceptance of the Critical Design Review.
______
NET AMT / NSP
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0011
Spares Acquisition
FFP – Spares Acquisition Integrated with Production (SAIP) Spare and Repair Parts for Item 0001. (SEE NOTE 2) Quantity and Pricing to be determined. This CLIN is to “To Be Determined” and will be negotiated upon final acceptance of the Critical Design Review.
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0012
Data for Item 0011
FFP – (See Exhibit “XX”) (NOTE 2) Quantity and Pricing to be determined. This CLIN is “To Be Determined” and will be negotiated upon final acceptance of the Critical Design Review.
______
NET AMT / NSP
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0013
Repairable Spares
FFP – Repairable Spare Assemblies and Repair Parts for Item 0001. (SEE NOTE 2) Quantity and Pricing to be determined. This CLIN is “To Be Determined” and will be negotiated upon final acceptance of the Critical Design Review.
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0014
Data for Item 0013
FFP – (See Exhibit “XX”) (NOTE 2) Quantity and Pricing to be determined. This CLIN is “To Be Determined” and will be negotiated upon final acceptance of the Critical Design Review.
______
NET AMT / NSP
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0015
Software tools developed for Item 0001
______
NET AMT / NSP
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0016
Commercial Software Products
FFP – (See Exhibit “XX”) (NOTE 2) Quantity and Pricing to be determined. This CLIN is “To Be Determined” and will be negotiated.
______
NET AMT

3

CONTRACT NUMBER: 12 Nov 2012

SECTION B Supplies or Services and Prices

OPTION ITEMS

ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0101 /

TBD

/ Set
OPTION – Production OTPSs
FFP – Fabricate, Integrate, Test and Deliver Production OTPSs IAW Statement of Work and Specification. Option will be exercised at time of award.
NOTE: BEFORE WRITTEN RELEASE FOR PRODUCTION IS RECEIVED IN WRITING FROM THE CONTRACTING OFFICER, THE ACQUISITION OF MATERIALS OR COMPONENTS FOR, OR THE COMMENCEMENT OF PRODUCTION OF, THIS CLIN IS AT THE SOLE RISK OF THE CONTRACTOR. SEE FAR CLAUSE 52.209-3 (g).
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0102 /

TBD

/ Lot
Option – Data for Item 0101
FFP – (See Exhibit AA)
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0103 /
Option – OTPS Fleet Introduction for Item 0101
FFP
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0103AA /

1

/ Each
Option – East Coast OTPS Fleet Introduction for Item 0103
FFP
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0103AB /

1

/ Each
Option – East Coast OTPS Fleet Introduction for Item 0103
FFP
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0103AC /

1

/ Each
Option – West Coast OTPS Fleet Introduction West for Item 0103
FFP
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0103AD /

1

/ Each
Option – West Coast OTPS Fleet Introduction for Item 0103
FFP
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0104 / TBD / Lot
Option – Data for Item 0103
FFP – (See Exhibit AB)
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0105
Option – Engineering/Technical Services
FFP – Engineering/Technical Services, Parts and Material and Travel/Per Diem in Support of Items 0001 and 0101.
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0105AA / 5,000 / Hours
Option – Engineering/Technical Services
T&M – NTE 5,000 hours. The contractor will provide one hourly rate for all labor categories. The rate should be based on the average of all labor categories proposed.
TOT ESTIMATED PRICE / ______
CEILING PRICE / ______
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0105AB / 5,000 / Hours
Option – Data for Item 0105AA
T&M – (See Exhibit AC)
TOT ESTIMATED PRICE / ______
CEILING PRICE / ______
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0105AC / 1.00 / Lot / $20,000.00
Option – Parts and Material for Item 0105AA
FFP – For evaluation purposes every offeror will be evaluated at $20,000.00
______
NET AMT
ITEM NO / SUPPLIES/SERVICES / QUANTITY / UNIT / UNIT PRICE / AMOUNT
0105AD / 5,000 / Hours
Option – Travel/Per Diem for Item 0105AA
T&M – For evaluation purposes every offeror will be evaluated at $10,000.00
TOT ESTIMATED PRICE / ______
CEILING PRICE / ______

NOTE (1): IF ANY PARTICULAR ITEM IS TO BE PERFORMED AT NO COST TO THE GOVERNMENT, THE ENTRY “AT NO COST” SHALL BE PLACED IN THE UNIT PRICE AND TOTAL PRICE COLUMNS.

NOTE (2): QUANTITIES AND PRICING FOR CLINS 0009-0016 HAVE NO SPECIFIC QUANTITIES STATED (SUCH AS LINE ITEMS FOR TESTS/OTHER SERVICES OR DATA LINE ITEMS WHICH REFERENCE EXHIBITS, ETC.). THESE CLINS ARE “TO BE DETERMINED" AND WILL BE NEGOTIATED AT A DATE BETWEEN CRITICAL DESIGN REVIEW AND FINAL ACCEPTANCE.

NOTE (3): “NSP” IS “NOT SEPARATELY PRICED”.

NOTE (4): THE GOVERNMENT WILL NOT ACCEPT PROPOSALS FOR QUANTITIES OTHER THAN THOSE SHOWN IN THE SCHEDULE.

NOTE (5): “LO” = “LOT”.

NOTE (6): “NTE” = “NOT TO EXCEED”.

NOTE (7): NO FACSIMILE OR EMAIL RESPONSES TO THE SOLICIATION WILL BE ACCEPTED. ALL OFFERS MUST BE SUBMITTER IN WRITING BEFORE THE CLOSING OF THE SOLICIATION.

3

CONTRACT NUMBER: 12 Nov 2012

SECTION C Descriptions and Specifications

SECTION C - DESCRIPTIONS AND SPECIFICATIONS
(STATEMENT OF WORK)

Item 0001 - The Contractor shall design, fabricate, integrate, test and deliver Operational Test Program Sets (OTPS) for Units Under Test (UUTs) listed in Attachment 1A. The Contractor shall deliver the Pilot Production OTPSs (Initial Production Units) in accordance with the requirements of Attachment 1 Statement of Work (SOW), MIL-PER-32070 Performance Specification for Test Program Sets, Attachment 2 Supplement to MIL-PRF-32070 and Attachment 3 General Acceptance Test Procedure (GATP).

All ancillary and augmentation equipment such as, power supplies, dummy loads, adapters, cables, extender cards, shorting plugs, test equipment, and testing/mounting/holding fixtures, required to operate and maintain the individual OTPS shall be furnished as part of each individual OTPS (excluding general purpose multimeters, scopes, etc.).

The Contractor shall furnish the following items with each individual OTPS delivered under this Item:

(a) two (2) optical disks (Operational Test Program Medium), with each optical disk containing the Operational Test Program (OTP)

(b) two (2) copies of the Operational Test Program Instruction (OTPI) on CD-ROM disks;

(c) two (2) copies of the technical manuals on CD-ROM disks;

Items 0002, 0004, 0005, 0006, 0007, 0008 and Option Items 0102, 0104, and 0105AB - The technical data and other data called for hereunder shall furnished in accordance with Exhibit A (Item 0002), Exhibit B (Item 0004), Exhibit C (Item 0005), Exhibit D (Item 0006), Exhibit E (Item 0007), Exhibit F (Item 0008), Exhibit AA (Option item 0102), Exhibit AB (Option item 0104), and Exhibit AC (Option Item 0105AB), Contractor Data Requirements List, DD Form 1423.

The Contractor shall maintain quality assurance procedures with relation to drawings, documentation, and changes. Prior to delivery of technical data to be furnished hereunder, the Contractor shall:

(a) validate each drawing and other design disclosure document against the item it depicts

(b) certify that each drawing and other design disclosure document accurately and completely represents and describes the related item, equipment, part, or assembly

(c) certify that such related item has been manufactured and supplied in accordance with such drawings or other design disclosure document

(d) certify that all technical data furnished conforms to the applicable requirements of the contract

The required technical data to be furnished under this contract shall be subject to in-process and final review in accordance with contract requirements.

Item 0003 – Pilot Production Test (Contractor Testing) shall be conducted on in accordance with the requirements of Attachment 1 Statement of Work (SOW), MIL-PER-32070 Performance Specification for Test Program Sets, Attachment 2 Addendum to MIL-PRF-32070, Attachment 3 General Acceptance Test Procedure (GATP), and the H-clause entitled "Pilot Production Approval - Contractor Testing."

Items 0009, 0011, and 0013 - The supplies or services to be furnished under the items identified will be ordered in contract modifications issued in accordance with Section H contract requirements entitled "Ordering--Provisioned Items."

Items 0010, 0012, and 0014 - The technical data and other data ordered hereunder by the Government pursuant to the Section H, "Ordering Provisioned Items" clause and the applicable Exhibit (Contract Data Requirements List, DD Form 1423) as identified by the applicable Exhibit Identifier in Section B, "Supplies or Services and Prices", shall be ordered in contract modifications issued in accordance with the Section H, Ordering--Provisioned Items" clause.

Item 0015 - The contractor shall deliver all software tools that were wholly or partially developed or enhanced under this contract used to develop a TPS.

Item 0016 - Commercial software products to be furnished under the items identified will be ordered in contract modifications issued in accordance with Section H contract requirements entitled "Ordering--Provisioned Items."

Item 0101 - The Contractor shall fabricate, integrate, test, and deliver the Production OTPSs for UUTs listed in Attachment 1A. The OTPS to be furnished shall be in accordance with of Attachment 1 Statement of Work (SOW), MIL-PER-32070 Performance Specification for Test Program Sets, Attachment 2 supplement to MIL-PRF-32070, and Attachment 3 General Acceptance Test Procedure (GATP).

All ancillary and augmentation equipment such as, power supplies, dummy loads, adapters, cables, extender cards, shorting plugs, test equipment, and testing/mounting/holding fixtures required to operate and maintain the individual OTPS shall be furnished as part of each OTPS (excluding general purpose multimeters, scopes, etc.).

The Contractor shall furnish the following with each individual OTPS delivered under this item:

(a) two (2) optical disks (Operational Test Program Medium), with each optical disk containing the Operational

Test Program (OTP);

(b) two (2) copies of the Operational Test Program Instruction (OTPI) on CD-ROM disk;

(c) two (2) copies of the technical manuals on CD-ROM disks;

Item 0103 - OTPS Fleet Introduction shall be performed in accordance with requirements of Attachment 1 (SOW) and Attachment 3, (GATP).