TTF3 Couplers

NON CONFORMANCE REPORT
Created by:
T. Nieland / D. Kiehl / Date: 1-15-2009 / Report NCR#
12
Supplier
C.P.I. / Supplier Address
150 SOHIER ROAD
BEVERLY, MA. 01915
Part name/ Number
Coupler / Warm Part 2988356/A.000 / Serial Number(s)
FH03 / Qty
1
Preliminary finding
A scratch in the copper plating 1/8 inch by 1/4 inch near the flange that mates to the cold part.

MRB: Reviewed on 1-15-2009 Reviewed by. JT. TN. DK. Repair in house
Out of tolerances? □ Yes □ No / Drawing #

Proposed Corrective / Preventiveactions


CorrectiveAction 4-14-2009
Take before and after photos of all items being repaired. Protect the coupler around the area that is being repaired with lint free cloth and / or rubber clean room glove. Use the HEPA vacuum during any particle generating operations. Remove a minimal amount of material by cutting a strip of 1200 grit Microfinish Cushioned Silicon Carbide Sanding Cloth (McMaster-Carr P/N 4611A313)as wide as the area to be abraded and long enough to wrap around your finger. ( 1/8 inch wide by 2 inches long ) Using your finger lightly abrade damaged area with a back and forth motion to remove any loose material, sharp edges, etc. Clean the repaired area with lint free clean room wipe and ethyl alcohol. Inspect repair and complete visual and metrology receiving inspection. ESD bag coupler cold part. Ship to Bldg. 6 for ultrasonic cleaning, leak check, and assemble for R.F. processing.
Preventive action
Person in charge of Corrective / Preventive action: Name Date Signature
Customer’s agreement
□ Solution up to Manufacture/supplier
X Solution was dispositioned and completed at SLAC National Accelerator Laboratory
□ Proposed solution is not accepted – new proposal:
DISPOSITION
Use as is□ RepairX Rework□ Return to vendor□ Scrap□ Other□
Customer’s Agreement: Name: Date:

Closing of the Non conformance

Planned corrective/preventive action has been completed:
Name Date / Independent verification has been completed:
Name Date