Cell: +971556019955(Abu Dhabi,UAE) Ahmed HussuinPMP,CCM,LEED AP,CFPS,PQP

+201000457733 (Cairo, Egypt)

Objective

MEP Manager(HVAC,Plumbing,Drainage, Fire Fighting,Electrical,Gas networks,Power,LV,GSM,FA Systems);More than 14 years of experience at several Leading International Contracting ,Consulting and Project Management firms focus on Construction / Project management ,HSE, Quality management, Execution, Estimations, Tendering, Project Documentation.

Key Qualifications

  • Experience in international codes and their applications (ASHRAE, BSI, ASME, SMACNA, NFPA, ASPE, UPC, IPC, DW144).
  • Experience in local codes and their applications (ADM, ADCD,ADDC,ADSSC, ADMCC, ADEWA,Estidama,QCDD,Kahrama).
  • Specialized in Engineering, Project Management & Construction Management of various types of Building Construction (High Rise buildings, Universities, Schools, Car Parks, District cooling plants, ETS, Commercial &Residential buildings, Hospital and infrastructure work).
  • Self-motivated team leader, able to act independently, under pressure, manage a number of multiple projects simultaneously, with a proven track record of day-to-day Management.Including specialized sub-contractors, service providers.
  • Experience in Installation and Fabrication Details.
  • Ensuring that technical targets required by the client are attained
  • Maintaining detailed record of technical developments and variations.
  • Ensuring that the client’s requirements are fully and correctly understood and are effectively communicated to the project team.
  • Subcontracts negotiations. Experience in contractual obligations.
  • Experience in HSErequirements (OSHA and Local regulations).
  • Problems solver and ability to multi-task. Coordinate and work with colleagues on all levels.
  • Fluent in English and Excellent in Arabic.

Professional Certificates and Technical Courses

  • (PMP)Project Management Professional by (PMI) ID: 1694921.
  • (CFPS)Certified Fire Protection Specialist by (NFPA).
  • LEED, AP (BD+C) accredited engineer by (USGBC) ID: 10803511.
  • (CCM)Certified Construction Manager by (CMAA)ID: 169598.
  • ASHRAE Member, Qatar Chapter ID: 008235846I.
  • (CFPS) Certified Fire Protection Specialist (In Process).
  • (PQP)Pearl Qualified Professional for ESTIDAMA projects in Abu Dhabi,UAE(PQP): ID: 1502.
  • Through knowledge of BIM software and implementation from Pre-Design to As-Built stage.
  • CourseinResidential HVAC Design in 2004 at ASHRAE Society, Cairo, Egypt.
  • Design courses for Plumbing systems and HVAC system from American University in Cairo, Egypt (2005).
  • Design course for Fire Protection system in Engineers Syndicate, Cairo, Egypt (2005).

Computer Skills

  • Advanced level in MS Word, Excel and Power Point.
  • Advanced level in AutoCAD®.
  • Advanced level in Mcquay® Duct and Pipe Sizing.
  • Advanced level in Aconex® ,Parshare®Project documentation.
  • Intermediate level in Elite® program.
  • Intermediate level in Carrier E20® program.
  • Thorough knowledge of Internet usage.
  • Through knowledge of BIM® software

Professional Experience

* MEP Manager: EllisDon (Multinational Co. Project and construction Management, Abu Dhabi

,UAE(October 2015-Present)

Provide management services for ANSAM Residential and commercial project developed by ALDAR in YAS

Island, Abu Dhabi.

  • Monitoring project budgets schedule and oversee performance to ensure on time, quality and on budget

Project execution.

  • Coordinate with the design team on all aspects of the design.
  • Attending regular meetings ( on work progress, coordination, design, etc. ) with Main Contractor and

Consultant to discuss key issues related to the project and take effective corrective actions.

  • Prepare periodic reports for management including status of budgets, variance/change claims, schedules,

Disputes, up-coming activities & safety records.

  • Ensure that the health and safety requirements are provided and that they comply with authorities

Regulations.

  • Provides guidance, managerial, technical support to project team.
  • Analyze drawings, specifications and statements of work in the preparation of activity networks for project

Resource planning and scheduling.

  • Carryout necessary follow-ups with vendors / suppliers / sub-contractors for timely execution / delivery of

The ordered items.

  • Ensuring that the quality of material and installation of works are in accordance with the acceptance

Criteria, specifications, approved materials and methods of installation approved for the project.

  • Schedule contractors, consultants, and vendors in critical path to ensure timely completion.
  • Perform quality control duties and responsibilities regarding the work being performed.
  • Ensure that the contractor is fully executing and complying with his contracted scope of work.
  • Ensure contractor has corrected all deficiencies identified by project team.
  • Identify conflicts in construction progress and communicate them to project team for resolution.

*Construction Manager (MEP):PARSONS(Multinational Co. for engineering, construction, technical, and management services, Doha, Qatar (June 2012-Oct2015)

Provide management services for Education City projects which are part of a Qatar Foundation for Education, Science and Community Development, a private, chartered, non-profit organization.

  • Manage and lead Main contractors/MEP subcontractors throughout duration of the project (from Groundbreaking through Commissioning and Turnover to Owner)
  • Provide feedback to design engineers on design deficiencies/customer problems and needs.
  • Recommend design modification to eliminate system malfunction.
  • Review schematic and detailed design and report/comment about constructability issues.
  • Conduct Value engineering workshops during design stage to ensure that systems functionality within conceptual budget.
  • Review (approve/reject) mechanical shop drawings ,Material submittals, prequalification’s, documents, RFI, lifting plans, Method statement and work program and implement my comments for the same.
  • Monitors and supervises daily the progress and the quality of the works, acts to make deficiencies rectified. Raises NCRs and ensures quality awareness of subcontractors.
  • Report to the SREthe pending issues,proposals, and progress.
  • Reviews services subcontractors ITPs, MSs etc. in coordination with the PQM.
  • Review monthly payment and compare it with actual progress and the cost loaded.
  • Attend and lead project meetings, including progress, pre-construction,Technical,Quality and Safety with Client representative, Design Consultant and authorities.
  • Provide guide line for main contractor and sub-contractors for handing over procedures and requirements(Red mark drawings ,As-Built, O&M manuals, spare parts list, training requirements and close-out).

*Senior MEP Coordinator:Arabian Construction Company (ACC),Abu Dhabi, UAE, (Nov 2009-May 2012)

Responsible for one of the biggest projects in Abu Dhabi (Ettihad Towers), Project consisting of 5 No of towers (60 up to 75 levels), 6 levels of podiums and 4 basementsProject’s MEP lump sum price is 650,000,000 AED.Project management HILL International.

  • Coordinates all Mechanical, Electrical, Plumbing, Drainage, Fire Fighting, Gas Works, Fuel Handling Systems, lifts, Escalators, Moving walks,etc with civil activities.
  • Liaises with Consultant, subcontractors, suppliers, PM, PCM, and PEs to ensure an effective interface with the construction schedule and full compliance
  • Inspects ongoing works and verifies compliance of services submissions, material deliveries and performed works.
  • Monitors testing and commissioning of plant and equipment and ensures their operation is adequately documented and retains results for record purposes of all testing and commissioning.
  • Monitors all subcontractors’ resources to ensure adequacy and availability to maintain the construction schedule.
  • Ensures that all related subcontractors are using and have received the valid contract drawings and documents related to their scope.
  • Supervises and ensures that works activities are performed in accordance with the construction schedule, latest approved drawings, documents, materials, mock-ups. Check them against contract drawings.
  • Coordinates with consultant regards approvals of drawings/material submittals related to all services.
  • Ensures compliance with and implementation of project PQP during all construction operations and reports to the site PQM site deficiencies.
  • Part of the handing over Team. Controls, supervises the application of handing over procedure, and inspect works and lists items needing rectification, distributes respective remedial responsibilities to the relevant Sub-contractors.

*Senior Mechanical Engineer: Advanced Technical Group (ATG), Dubai, UAE (Jan 2007-Nov 2009).

Responsible for various projects leveled from G+1 (Villas) up to G+50 (Danat Al Khan) in Dubai, Sharjah and Al Ain in UAE.

  • Review Mechanical (HVAC, Plumbing and Fire Fighting) design.
  • Prepare and supervise Mechanical (HVAC, Plumbing, Fire Fighting) shopdrawingsproduction.
  • Calculations for HVAC and Plumbing related systems(Pumps Head Calculation, ESP for fans and Cooling Load)
  • HVAC, Plumbing and Fire Fighting materials and equipments selection. Prepare materials submittals and compliance statements in light of contract specifications and drawings.
  • Takeoff materials of HVAC,Firefighting,Drainage and Water Supply.
  • Coordinate Mechanical works with Electrical works. Coordinate MEP works against Structural and Architectural drawings.
  • Prepare and Supervise the production of Builders’ works shop drawings to ensure compatibility with architectural and structural drawings.
  • Attend and conduct project meetings as assigned by the Executive Manager.
  • Company's sites HVAC superintendent ensure that work installations comply with project specifications.
  • Report in details the status of MEP and specialties subcontractors to Executive management.
  • Maintains proper channel of communication with the other works managers to ensure full cooperation and successful coordination of the works on site. Oversee and advise the Project Manager regarding any potential critical problems/obstacles that work progress may face or cannot be resolved and achieved.

Main Projects:

-Alawqaf Commercial Office Building, Dubai (HVAC).
-Ministry of Health, Dubai (HVAC and F.F).
-Comfort Inn Hotel, Dubai (MEP).
-Dant Al-Khan Tower, Sharjah (HVAC).

-Extension of Rashid’s Hospital.

*Site Engineer:Kharafi National, Cairo, Egypt (June 2004-Jan2007).

Work in AmericanUniversity in Cairo New Campus Development project (main package). Project’sMechanical lump sum price is 280,000,000 EGP. Project management is Fluor International LTD.

  • Responsible on all mechanical work (HVAC, Plumbing and Firefighting) at Utility Plant.
  • Responsible on all mechanical work at student housing(13 units G+3)
  • Installation of all infrastructure pipes for Chilled Water, Plumbing and Fire Fighting.
  • Coordinate between the different trades.
  • Coordinate with Stores for material requirements & issue requisition to Stores for materials as per Material Schedule.
  • Ensure all works to be done in a safe manner and complying with HSE requirements.
  • Responsible of manpower activities and ensure that they have the latest modification.
  • Daily, weekly and monthly reporting.
  • Rectifying NCR (Non Compliance Report) with site engineers..
  • Collaborate in shop drawings review, study ,filter and check for compliance with project specification and applied codes before submitting to Project Management
  • Collaborate in shop drawings review, study ,filter and check for compliance with project specification and applied codes before submitting to Project Management
  • Prepare and write RFI’s.
  • Prepare of as-built drawings.
  • Participate in testing and commissioning.

Mechanical Engineer (Trainee):Training in Enco(Electromechanical Company), Egypt (2003-2004).

Education

Bachelor of Science of Mechanical Powers Engineering, Helwan University, Cairo, Egypt (2004).

GradeGood.

Distinction in Graduation project of characteristic of condensation of R134a on smooth and finned tube.

Grade Excellent.

Personal Information

  • Date of Birth: 23rd January 1982.
  • Place of Birth: Kuwait.
  • Driving Licenses: UAE, Qatar, Egypt.
  • Marital Status: Married.

Page 1 of 4