Event Description: MarkeTrak Task Force Meeting Notes / Date4/23/13 / Completed by: Craig Dillon
Attendees:
Onsite
Gricelda Calzada / AEP
Cheryl Franklin / AEP
Monica Jones / Reliant
Jim Lee / Direct
Jonathan Landry / Gexa
Carolyn Reed / CenterPoint
Craig Dillon / ERCOT
WebEx
Barrett Morrow / CenterPoint
Debbie McKeever / Oncor
Kathy Scott / CenterPoint
Leylis Suarez / Frontier
Liz Fannin / Oncor
Lori Ellard / Reliant
Sheri Moore / CenterPoint
Sheri Wiegand
Stephen Wilson / TX Power
Tammy Stewart / ERCOT
Teresa Rodriguez / Stream
Tracy Johnson / TXU
Sandra Tindall / ERCOT
Agenda:
1 / Introductions
2 / Review/Discuss current MarkeTrak Projects Q and A / ERCOT
3 / ERCOT Update- Serena Upgrade and SCR756 /Scope and Deliverables / ERCOT
4 / MarkeTrak User Guide General Discussion: Review Sections 3-4
5 / Review Additional Suggestions for MarkeTrak User Guide
6 / Gather Action Items
7 / Additional Business Items
8 / Adjourn
NOTES:
  1. Status - Tammy – going well – on track . about 80-85% complete with screenshots and redlines to IAG into new screenshot section. Keep sending redlines.
  2. Testing going well.
  3. Looks like migrating to Cert first week of June (tentative date)
  4. Carolyn – last month anticipated user guide changes ready by 5/1
  5. Tammy – still goal
  6. Carolyn – training ready for MTTF also?
  7. Tammy – yes
  8. Section 3 and 4 review
  9. Received 2 suggestions via email
  10. Email from Cheryl (AEP) – regarding cancellation window
  11. Cheryl – under “5 validations added” – protocols now say 1 business day, says 2 in guide currently under “cancel”
  12. Reviewed protocol and edited guide
  13. *example from txset 4.0 business requirements (MCT page) to be added*
  14. Reviewed 2 day statement for MVO – section references a “Y” or “N” priority flag. This field is still active. Designed for TDSP to prioritize
  15. Tammy – if issue submitted 4 days outside SMRD would say “N” as not priority. Visible to all users
  16. If service order is in review and no SMRD populated, nothing there and should be blank. Based on submittal date within 2 day window
  17. Jonathan – once TXSET reduced timelines, should be updated to match TXSET?
  18. Tammy – internal change request but not associated with project
  19. Carolyn – SIR?
  20. Tammy – yes. Would be internal code change.
  21. ***Tammy – ask internally about changing priority flag from 2 day to 1 to match TXSET 4.0 and update next month***
  22. Question how txset 4.0 change was made and scoped early 2011, but this issue did not get caught
  23. Cheryl referenced 14 day (#9) in 3.1.3.2 – is 14 day still applicable?
  24. Tammy – still 14 days
  25. Carolyn – Inadvertent timeline was reduced depending on subtype and status of issue
  26. Cheryl - 3.1.3.3, figure F, #10 – doesn’t go new ERCOT, goes “autocomplete” if TDSP clicks “ERCOT Cancel”
  27. Tammy – if invalid globalid that prevents service order validation, would be new ERCOT. Goes into autocomplete and transitions to submitting MP.
  28. Cheryl – 3.2(f) – add arrow under screenshot to complete
  29. Monica – question to ERCOT – do you as changes come make modifications? TDSP Approved Cancellation Reasons are very outdated and still have AREP data in scenarios.
  30. Determined scenario D (AREP) invalid. Other scenarios have transactions that could be used in place of these processes, but TDSPs could still utilize this process if needed.
  31. Section 4 edits
  32. Cheryl – 4.1b
  33. Remove “Service Period Start Date” as not listed as option.
  34. ***Tammy – review 4.1b to verify and bring back to next meeting***
  35. Cheryl – 4.1.3.2(3) – same issue as 4.1b. both sections edited to indicate instruction rather than a new item or field value/label
  36. ***Tammy - 4.1e (page 7) – add additional screenshot after number 10 showing tranid field.***
  37. ***Tammy/Market Rules – review screenshots in section 4 (and everywhere in user guide) for screenshot numbers – they repeat and need to be consistent with section numbering – not repeating same screenshot id in multiple instances***
  38. Section 2.1.4 suggestion – reference to RMG section 7.2.5, should be section 7.3.5.
  39. ***Tammy – update to fix this statement to reflect 7.3.5***
  40. OTHER BUSINESS
  41. Next meeting 5/21
  42. 6/10 MTTF training 1-5
  43. ***Craig – talk to bill kettlewell regarding adding training to training page. ***

Action Items
  • Tammy – ask internally about changing priority flag from 2 day to 1 to match TXSET 4.0 and update next month
  • Tammy – review 4.1b to verify and bring back to next meeting
  • Tammy - 4.1e (page 7) – add additional screenshot after number 10 showing tranid field
  • Tammy/Market Rules – review screenshots in section 4 (and everywhere in user guide) for screenshot numbers – they repeat and need to be consistent with section numbering – not repeating same screenshot id in multiple instances
  • Tammy – update to fix this statement to reflect 7.3.5
  • Craig – talk to bill kettlewell regarding adding training to training page.