W. M. KECK OBSERVATORY

CALIFORNIA ASSOCIATION FOR RESEARCH IN ASTRONOMY

Keck Engineering Time Proposal

Title: / Test DCS Tertiary S/W Mds
Date of Observation: / Jan 31, 2007
Lead: / A, Honey
Other persons involved: / E. Chock
Telescope(s) / K1
Instrument(s) / Whatever tertiary instrument is configured for eng that nite
Sky time Requested
Date(s) to avoid
Required conditions / Tertiary instrument
Purpose (Please describe succinctly the main purpose of the proposal: development project, general telescope engineering, instrument commissioning, problem trouble shooting, data quality, etc.):
Release and test tertiary s/w mods at night; release of kroot/rel/dcs/tcs part of tree.
ECRs 951 & 1011.
951 - TCS mods to alleviate tertiary problems
Reason_for_Change
------
If the tertiary is moving when another instrument selection occurs the tertiary will end up at the wrong place.
Description_of_Change
------
Modify the TCS so that it only allows an instrument selection if the tertiary is locked when the selection is issued.
·  Ecr 1011 - Tertiary sequencer enhancement for local/remote switch overs
Reason_for_Change
------
The tertiary sequencer does not currently monitor the local/remote state when locked in a detent and hence confusion can occur.
Description_of_Change
------
Add a new state LOCAL_WAIT and modify the LOCKED state to transition to LOCAL_WAIT. In the new state a transition will occur when remote control is re-established. The next state depends on the tertiary module id being present or not and the detent pin state. In addition the encoder position will be examined to determine fit the focal station was changes whilst in manual mode.
Description (Please describe your night-time engineering plan; provide justification for the time request, and include figures, ECR description and other attachments if necessary):
Most of the testing can be done in daytime prior.
We would like to release this on an eng. nite w/ a tertiary instrument. This fix can be run at night in the background (piggyback) with whatever other engineering is commencing that night.
Plan for data reduction, analysis, and reporting:
Other resources needed:
Status and progress reports from previous use of engineering time: