APPENDIX 9 J

Board of Regents of the University System of Georgia

Certificate of Readiness for Partial Occupancy

Project Number Date:

Project Name Institution

Architect

Applicable to spaces: Designate the spaces by number or other positive identification)

This certificate given by the undersigned, ______Architect, witnesses as follows: Except as set forth on a schedule attached hereto dated ______the spaces enumerated in the caption of the present certificate were fully (Insert date of schedule)

constructed and completed as provided in the plans and specifications on this ______day of ______, ______.

2. A certificate of occupancy has been issued by the State Fire Marshal dated and numbered , said certificate having been delivered to the following person at this specified address: ______.

University System of Georgia App. 9 J-1

Building Project Procedure 2000

APPENDIX 9 J

3. All tests and inspections provided for in the plans and specification have been made in the presence of a registered architect or registered engineer and all work was found to meet said tests and inspections in accordance with plans and specifications except as noted in the schedule attached hereto. All mechanical systems, equipment, apparatus and controls (plumbing, heating, electrical, water, septic tank, and sewerage disposal fields, refrigeration, kitchen equipment, fire alarm, program and public address systems, etc.) have been started up, tested and inspected in the presence of a registered architect or registered engineer and have been found to be (a) in compliance with the plans and specifications, (b) in compliance with all applicable codes, and (c) in safe operating condition, except as set forth in the above-mentioned schedule.

4. All work has been installed in such manner as to comply strictly with all laws, ordinances, codes, rules, and regulations bearing on the conduct of the work as drawn and specified except as set forth in the above-mentioned schedule.

5. No work has been certified for payment which was covered prior to consent of the architect.

6. This certificate applies only to the areas and spaces referred to in the caption of the present certificate.

7 This is not a final certificate.

This day of , .

(Insert name of architectural firm)

By:

Title:

Schedule of Exceptions dated

(Insert date of schedule of exceptions)

Schedule of Exceptions

Date:______

1.

2.

3.

4.

(Attach additional pages as required.)

University System of Georgia App. 9 J-1

Building Project Procedure 2000