Attachment 2 – Meeting Room Attendance Record

NOTE: Van., OKC, Ral., and PBGH info. not yet factored into MAX or AVG figures. Check Committee website for future update.

Nash, TN / Niagara F. / Amster. / Orlando / Van. B.C. / OKC,OK / Ral, NC / PBGH,PA
GROUPS / Apr. 00 / Oct 00 / Apr01 / Oct 01 /
Apr02
/ Oct 02 / Mar 03 / Oct 03 / MAX / AVG
Committee Registration: Members and Guests
ee Registration: Members and Guests / 302 / 361 / 265 / 289 / 280 / 280 / 332 / 335 / 361 / 285
Spouses / 94 / 94 / 67 / 69 / 81 / 81 / 41 / 46 / 94 / 63
Luncheon / 175 / 217 / 131 / 149 / 161 / 176 / 207 / 211 / 262 / 196
SC ADMINISTRATIVE / 23 / 22 / 18 / 24 / 23 / 20 / 19 / 22 / 24 / 21
NEWCOMERS ORIENTATION / ~30 / ~20 / ~25
SC Meeting and planning / 15 / 17 / 22 / 18 / 14 / 17 / 15 / 15
SC AUDIBLE NOISE AND VIBRATION / 21 / 21 / 17 / 27 / 25 / 17 / 21 / 25 / 32 / 25
WG Sound measurements / 23 / 19 / 18 / -
WG Transformer siting guide C57.136 / -
SC BUSHINGS / 28 / 28 / 28 / 29 / 42 / 44 / 46 / 37 / 32 / 26
WG Revision C57.19.00 / 25 / 38 / 25 / 27 / 36 / 29 / - / - / 38 / 28
TF Draw Lead Bushings / 24 / 27 / 18 / 13 / 42 / 27 / 21
WG Revision C57.19.01 / 19 / - / 38 / 27
SC DIELECTRIC TESTS / 91 / 96 / 62 / 87 / 93 / 117 / 124 / 112 / 96 / 77
WG Revision to Low FrequencyTests / 48 / 34 / 48 / 40 / 50 / - / 54 / 41
WG Revision of Transient Dielectric Tests / 43 / 37 / 38 / 40 / 34 / 35 / 43 / 34
TF Rev. to Impulse Tests / 19 / 41 / 27 / 46-WG / 38 / 19 / 19
TF L.F. Transformers Dielectric Test Table / 46 / 60 / 45 / 46 / 54 / - / 46 / 43
WG Partial Discharge Tests / 47 / 66 / 65 / 44 / 41 / 86 / 74 / 57 / 66 / 55
SC DISTRIBUTION TRANSFORMERS / 53 / 41 / 50 / 45 / 40 / 47 / 32 / 53 / 42
WG Dist. Substation Transformers C57.12.36 / 40 / 37 / 32 / 22 / 28 / 30 / 38 / 40 / 29
WG Overhead Type Distr. Transfs. C57.12.20 / 49 / 39 / 40 / 36 / 32 / 32 / 29 / 49 / 36
WG Single-Phase Submersible C57.12.23 / 20 / 18 / - / - / 41 / 21
WG Single-Phase Deadfront Padmount C57.12.25 / 47 / 33 / 35 / 27 / 40 / - / 47 / 38
WG Bar Coding / - / - / 40 / 40
WG Loss Evaluation C57.12.33 / 45 / 49 / 41 / 48 / 35 / - / 49 / 47
WG Electronic Data Transmittal / 22 / 17 / 16 / 26 / 21 / 22 / 22 / 17
WG Three-Phase Padmount C57.12.34 / 42 / 33 / 40 / 36 / 38 / - / 42 / 33
WG Step-Voltage and Induction Regs C57.15 / 26 / 26 / 18 / 31 / 26 / 17
SC DRY-TYPE TRANSFORMERS / 25 / 31 / 20 / 20 / 21 / 20 / 27 / 19 / 33 / 25
WG Test Code C57.91 / 11 / 24 / 12 / 10 / 13 / 12 / 24 / 20 / 23 / 18
WG Dry-Type Reactors / 10 / 11 / 13 / 7 / 10 / 10 / 9-TF / 18 / 13 / 10
WG Dry-Type Thermal Eval. And Flammability / 16
WG Dry-Type General Requirements C57.12.01 / 23 / 23 / 14 / 25 / 20 / 18 / 15 / 28 / 23
WG Dry-Type Thru Fault Current C57.12.59 / 15 / 16 / - / 16 / 16

Notes: Data maintained for four years only. Updating required to include all WG’s presently meeting, and remove WG’s no longer meeting.

NOTE: Van., OKC, Ral., and PBGH info. not yet factored into MAX or AVG figures. Check Committee website for future update.

Nash, TN / Niagara Fl’s / Amster. /
Orlando
/ Van. B.C. / OKC,OK / Ral. NC / PBGH,PAA
GROUPS / Apr. 00 / Oct. 01 / Apr01 / Oct. 01 /
Apr02
/ Oct 02 / Mar 03 / Oct 03 / MAX / AVG
SC HVDC CONVERTER TRANF. & REACTORS / 7 / 19 / 15 / 7 / 13 / 14 / 13 / 23 / 19 / 10
IEC TC 14 TAG / 37 / 30 / 14 / 27 / 12 / 20 / 25 / 37 / 27
SC INSTRUMENT TRANSFORMERS / 10 / 17 / 15 / 16 / 18 / 22 / 13 / 11
WG C57.13.5 Test Req Instr Transf >115 kVA / 10 / 13 / 13 / 16 / 12 / 23 / 17 / 20 / 14
WG C57.13.6 Instr Transf for Electronic Meters & Relays / 11 / 11 / 13 / 14 / 15 / 20 / 16
WG Revision of C57.13 / 10 / 10 / 9 / 12 / 18 / 18 / 17 / 11
SC INSULATING FLUIDS / 75 / 66 / 70 / 33 / 39 / 40 / 33 / 84 / 70
SC INSULATION LIFE / 51 / 66 / 30 / 109 / 90 / 84 / 107 / 96 / 109 / 64
WG Loading Liq. Transformer / 58 / 76 / 86 / 74 / 108 / 81
WG Revision of Temperature Test Code / - / 49 / 29 / 26
WG Thermal Duplicate / 27 / 30 / 26 / 41 / 30 / 40 / 31
TF Winding Temperature Indicators / 27 / 28 / 23 / 22 / 23 / 23 / 64 / 32 / 25
TF On Temperature Rise Clause 5, C57.12.00 / 27 / 34 / 25 / - / - / 27 / 27
SC PERFORMANCE CHARACTERISTICS / 69 / 82 / 81 / 102 / 110 / 115 / 129 / 92 / 102 / 71
WG Loss Tolerance and Measurement / 33 / 37 / 29 / 31 / 29 / 24 / 36 / 24 / 37 / 30
WG PCS Rev. C57.12.00 / 49 / 70 / 37 / 63 / 51 / 53 / 69 / 80 / 75 / 57
WG PCS Rev. C57.12.90 / 42 / 65 / 34 / 44 / 76 / 91 / 65 / 60 / 65 / 41
TF Joint/PSIM low pf measurement / 22 / 50 / 34 / -
WG Switching Transients / 52 / 49 / 39 / 50 / 45 / 60 / 94 / 75 / 52 / 42
WG DETC specifications and tests / 49 / 40 / 3 / 62 / 44-PT / 52-PT / 50 / 43
SC POWER TRANSFORMERS / 66 / 109 / 80 / 116 / 112 / 110 / 113 / 120 / 116 / 65
WG LTC Performance / 24 / 21 / 29 / 24 / 40 / 44 / 50 / 41 / 31 / 27
WG C57.140 Transformer Life Extension / 62 / 48 / 35 / 66 / 66 / 72 / 100 / 71 / 66 / 48
WG Monitoring of Liquid Immersed Transformers / 55 / 70 / 82 / 56 / 47 / 70 / 54
TF Control Cabinet Guidelines / 49 / 29 / 42 / 36 / 31 / 49 / 49
WG Revision of C57.12.10 / 37 / 30 / 27 / 34 / 28 / 40 / 33 / 23 / 37 / 32
WG West Coast / 20 / 11 / 10 / 13 / 13 / 13
WG Installation of Liquid Filled Transformers, C57.93 / 39 / 57 / 59 / 35 / 45 / 39 / 39
WG Phase Shifting Transformers C57.137 / 26 / 45 / 25 / - / 45 / 33
SC STANDARDS / 38 / 32 / 47 / 30 / 38 / 47 / 23
Standards Development Practice Review / ~50 / ~50 / 8
SC UNDERGRND. TRANF. & NETWK. PROTCS. / 26 / 18 / 3 / 13 / 14 / 13 / 15 / 10 / 26 / 16
WG Three-Phase Underground Transfs. C57.12.24 / 27 / 15 / 4 / 9 / 15 / 14 / 27 / 14
WG Liquid-Filled Sec. Network Transfs. C57.12.40 / 16 / 15 / 14 / 14 / 15 / 18 / 20 / 17 / 16
WG Secondary Network Protectors C57.12.44 / 10 / 14 / 10 / 8 / 8 / 11 / 17 / 14 / 11
WG Dry-Type Network Transfs. C57.12.57 / 10 / 15 / 9 / 7 / - / - / 15 / 9

Notes: Data maintained for four years only. Updating required to include all WG’s presently meeting, and remove WG’s no longer meeting.