APPENDIX C.5 Vessel Fajardo II Condition Survey

M/V Fajardo II

ON. D1047275, 272 PASSENGERS

CONDITION SURVEY

CS-01-March/15/2011

Inspection Date: February 28, 2011

Condition Survey Date: March 15, 2011

Inspected by: Eng. Carlos E. Claudio

Location: Fajardo Terminal, Playa Puerto Real, Puerto Rico

Built: 1996

LOA: 95 FT., NET/GR Ton: 64/94

Hull: Aluminum

Propulsion/Gear: Detroit (2) 16V92TI, 1100HP / Twin Disc

Propellers: Michigan Dyna-Quad

Actual Status: Out of service, Dry dock expires, May 22, 2011

Next Annual COI expire, May 22, 2011

Index:

Scope of Work

Analysis

Condition Survey Report

Scope of Work:

The purpose of this report is to present actual operating conditions of

M/V Fajardo II as per owner’s instruction after a visual inspection of

on board equipment.

Pictures and comments report presentation of outstanding items to be

correct in way to maintain vessel in operating conditions.

Analysis and recommendations on immediate and long terms

maintenance projections included.

Analysis:

Vessel in excellent condition with just minor maintenance work to be accomplished.

Steering system reliability and design analysis is highly recommended due to past experience and actual system configuration.

Rudders hydraulic cylinder height related to steering quadrant position to be corrected.

Vessel in excellent overall conditions.

Condition Survey Report

Vessel: Fajardo II

Report Date: March 15, 2011

Inspection Date: February 28, 2011

Report: Condition Survey, CS-01-March/15/2011

By: Carlos E. Claudio

Location – Engine Room:

Bilges oily waste water removal:

Oily waste under Main Engine Oily waste under Main Engine

Oily waste water Oily waste water

Copper steering piping renewal with proper pressure piping required:

Steering remote station Remote station control

Cooper piping

Cooper piping

Cooper piping at Steering PTO Pumps

Renew damaged Fire Pump:

Old Fire Pump New Fire Pump

Main Engines removal insert plates water leaks at overhead, install proper marine gasket material silicon avobe.

Main Engines insert plates

Above inset plate Port side Above insert plate Stbd side

Location - Space No. 6, (Steering Compartment, Lazarette):

Rectify rudders hydraulic cylinder height to align with quadrants:

Stbd hydraulic cylinder Stbd rudder quadrant

Port hydraulic cylinder Port rudder quadrant

Cylinder misalign Cylinder misalign

1

Confidential