AFLOAT SELF-ASSESSMENT CHECKSHEET (MOB-D ASA 1)Dated: 23 JUN 2008
DC CENTRAL / CCS INSPECTION / BRIDGE / DC REPAIR STATIONREV 1
USS ______Date of Inspection ______
Compartment / Noun Name ______
References:
(a)OPNAVINST 3120.32(Series)
(b)COMNAVSURFORINST 3541.1(Series)
(c)COMNAVSURFLANTINST 3540.18(Series)
(d)COMNAVSURFPACINST 3540.13 (Series)
(e)General Specifications
(f)NTTP 3-20.31
(g)NSTM 070
(h)NSTM 074 V3
(i)NSTM 079 V2
(j)NSTM 470
(k)PMS
(l)COMNAVAIRLANT/PACINST 3500.20
OVERALL PROGRAM EVALUATION:
EFFECTIVE _____ PARTIALLY EFFECTIVE _____ NOT EFFECTIVE _____
GUIDELINES FOR SYSTEM EVALUATION:
1. EFFECTIVE: Setup/equipage correct with few deficiencies. Publications are updated.
2. PARTIALLY EFFECTIVE: Setup/equipage has some deficiencies but achieves the basic goals. Specific deficiencies have been identified.
3.NOT EFFECTIVE: Program is not maintained and significant discrepancies noted. Serious deficiencies which prevent the program from serving its intended purpose; or has an accumulation of minor deficiencies which together severely impair effectiveness; or there is no functional program in practice. An immediate, intensive training effort is required for all personnel involved to enable the program to regain effectiveness. Close oversight by senior personnel/ICIS is required
Y / N1. / Complete set of up to date DC plates available? (According to NTTP only plates 2 and 3 are needed on the bridge)
2. / Is an up to date DC book available? (6 months grace period for ships recently out of overhaul)
3. / Are changes to the master DC book properly entered?
4. / Are the fire main gauges mounted, calibrated when required and labeled?
5. / Is a propulsion plant and vital auxiliary status board available? (Graphic display of main propulsion and auxiliary machinery readiness) [Not required where DCC and main control are centralized]
6. / Are sufficient amount of DC message blanks available?
7. / Are there provisions for emergency communications readily available in repair locker?
8. / Are communicationsavailable for each condition one phone talker?
9. / Is there adequate emergency lighting provided?
10. / Is a current daily liquid load & sounding list in feet and inches in DCC with the previous day readings/date? (Except sea water compensated vessels)
11. / Is the DCA’s library up to date and library being maintained IAW NTTP 3-20.31?
12. / Is the Master Compartment Check Off List available?
13. / Are the Ship Information Books / General Plans available?
14. / Are clinometers for determining actual list and trim permanently installed and functional?
15. / Is a TYCOM Repair Party Manual available in all command and control stations with all applicable notebooks tailored to the ship?
16. / MISCELLANEOUS DC REQUIREMENTS FOR TRAINING
a. / Does the ship have training EEBD’s? (CNSP 220156Z JUN 92)
b. / Does the ship have working smoke machines?
c. / Does the ship have DC flag kits for Main Space Fire, Flooding and Fire?
d. / Does the ship have the “Sounds of DC” CD?
Remarks: ______
______
______
______
______
______
______
______
ISIC / ATG REPRESENTATIVESHIP’S DCA/DCC CHIEF ENGINEER
- 1 -