UCCS Indoor Practice Facility and Baseball Diamond Project
Project No. 16-0018
Addendum No. 1 - CM/GCQuestions for IPF CM/GC proposals
- Are there any soils reports or additional information related to the site conditions for the 2 sites?
Answer: We do not currently have a soils report for the project sites. UCCS is engaging a geotechnical engineer and will provide a soils report for both sites.
- Could you please clarify the page limitation for the RFP, page 12. Proposals shall have a maximum of 30 pages. Does this mean 30 single-sided pages (15 double-sided) or 30 sheets printed double-sided?
Answer: The intent is to have a 30-page limit where each page is the side of a sheet. However, the page limit does not include your covers, dividers, or cover letter. Additionally, you may place team member resumes in an appendix which we will not count against the 30-page limit.
- During the mandatory pre-proposal meeting, it was stated that the $7MM Indoor Practice Facility was funded, and that the $5MM Baseball Diamond Alternate has not yet been funded. If a general contractor is shortlisted and must provide a sealed Cost Proposal Form, which project scope should their Cost Proposal Form cover? Should the Cost Proposal Form fees, GC’s and Other Reimbursable GC costs be based on only the $7MM Indoor Practice Facility project, or should fees, GC’s and Other Reimbursable GC costs be based on $12MM (i.e. the combined $7MM IPF project plus the $5MM Baseball Diamond project)?
Answer: The base bid shall include the Cost proposal form listed fees, General Conditions and Reimbursable costs for the $7M Indoor Practice Facility. Also provide, as an add alternate, the fees, GCs, and reimbursable costs for the addition of the $5M baseball diamond. When figuring the additional costs, presume that both projects will be completed together.
- Some of the Cost Proposal Form cost items will be related to the project cost of construction. However, the CM/GC RFQ states that the total estimated project cost of $12MM is to include A&E, FF&E, construction, code review, site preparation and mitigation, landscaping, plazas, hardscape and site furnishings.
- If the Cost Proposal Form fees, GC’s and Other Reimbursable GC costs are be based on building only the Indoor Practice Facility project, can you tell us what portion of that $7MM is earmarked for construction cost?
Answer: The approximate construction cost of the Indoor Practice Facility and associated site work not including GC fees, reimbursables, or General Conditions is approximately $5.1M.
- If the Cost Proposal Form fees, GC’s and Other Reimbursable GC costs be based on building both the Indoor Practice Facility project and the Baseball Diamond project, can you tell us what portion of that $12MM is earmarked for construction cost?
Answer: The approximate construction cost of the Indoor Practice Facility and Baseball Diamond Project with associated site work not including GC fees, reimbursables, or General Conditions is approximately $8.9M.
End of Addendum