Proposedarchitecturalplanningconceptandfeasibility study applied to the development of the territory of Minsk Porcelain Plant Open Joint Stock Company
/ EXPLICATION
  1. – A Shopping center
  2. –A multilevel parking for 300 cars
  3. – An Entertainment center
  4. - A multilevel parking for 500 cars
  5. – An underground two-level parking for 140 cars
  6. –A multistory block of flats with built-in and built-on public premises
  7. - A multistory block of flats with public premises built-in the ground floor
Legend:
Border of the territory of Minsk Porcelain Plant
Housing area
Infant and secondary schools
Municipal buildings and public services facilities
Health facilities
Production and municipal facilities
Red lines
Border of the territory of Priorbank Open Joint Stock Company
1 / Date of auction / July 5, 2013
2 / Auction piece / Therighttodesignanderectcapitalfacilities (buildings, structures) on a provided lad plot locating facilities to be pulled down
3 / Real estate location / IntheareaofKropotkina-V. Khorouzhey-Chervyakova streets and Masherova Avenue
4 / Starting price of auction piece in Br/ USD / 12123902580/1398 374
5 / Earnest / 10 %
6 / Land plot total area, ha / 4,2958
7 / ThecostsforpreparingdocumentsforconductingtheAuctioninBr / 48 611 380
8 / Landplotfunctionality / Amultifunctionalpubliccenter
9 / Requirements to the development / Pursuanttothe feasibility study;
The territory of the 1-steconomic and planning zone;
Sports and entertainment center;
Shopping center;
Housing estate;
Household services facilities
10 / Availability of encumbrances / Therealestatefacilitiesaretobepulleddownat: KropotkinaSt., 91, 91/2, 91/3, 91/4, 91/5, 91/7, 91/10, 91/12, 91/14 (buildingsofthesewage water treatment plant, transformer substation, painting shop, warehouse, industrial shops, garage, industrial shop, test section, industrial shop №2;protection enclosures, revetment walls, gate)
11 / AnapproximatesizeofthedamagecausedbythelandplotwithdrawalandpullingdowntherealestatefacilitieslocatedthereininBr / 66 494 601 000
12 / Сontacts / UE «Minsk city real estate center»
Minsk, 39, K.Marksa St.
Tel.: (017) 226-16-72
Fax: (017) 327-40-22

Investment proposal (land plot)

1. General information
Name / The right to design and erect capital facilities (buildings, structures) on a provided land plot
Totalarea (m2) / 43 000
Location / Region / Minsk
District / Minsk
Town / Minsk
Address / In the area of Kropotkina-V. Khorouzhey-Chervyakova streets and Masherova Avenue (the former territory of Minsk Porcelain Plant)
Land ownership
Owner’s name / state (municipal)
Minsk
Purpose of use / Building of capital facilities according to requirements of the territory of the 1-st economic and planning zone of Minsk-city (sports and entertainment centers, shopping centers, housing estates, household services facilities)
Means of use / lease
Cost (cadastral) (per 1 m2) as of January 1, 2013(Br,USD) / 471,77 USD per 1 m2
The initial price a subject of auction(Br,USD) / 12123902580 Br (1398374 USD)
Buildings on site / Buildings of the sewage water treatment plant, transformer substation, painting shop, warehouse, industrial shops, garage, industrial shop, test section, industrial shop №2; protection enclosures, revetment walls, gate
2. Transport connection
Distance from site (km) / Name
Highway / 6-8 кm. / М-9 (main street of continuous movement)
Main republican roads / 6 кm. / Р - 58 (Papernyansky highway)
Airport / 6 кm. / Minsk - 1
Railway / 4,8 кm. / Minsk - Passenger
Access roads / Municipal road network
Other / Situated in the central part of Minsk-city
3. Infrastructure
Distance from site (km) / Description (power, volume,etc.)
Electricity / within the area / providedelectricpower 1650 kW per year. the connection from the distribution substation (RP-114) powered from 110/10 kV.
Heating system / within the area / provided heat consumption 4,236Gcal per hour. Connecting from heating intra-networkkv.410d400mm (heating duct№31)
Drinking water / within the area / provided water consumption of 327.0 m3 perda.Connection point - the municipal water supply network (piezometer-238m)
Industrial water / within the area
Hot water supply / within the area / according to the specifications
Wells
Sewerage / within the area / sewer collector d 500 mm
Gas supply / within the area / medium pressure gas pipelines D=57,63mm,D=89мм
Other(incl. adjoining infrastructure: industrial enterprises, raw material sources) / Infrastructure facilities are located within the boundaries of the land plot (electricity, heating system, drinking water, industrial water, hot water supply, sewerage, gas supply)
4. Contact information
Contact person (position) / Manager Irina Germanovitch
Phone / (+375 17) 226-16-72
Fax / (+375 17) 327-40-22
E-mail /
site plan / photo (ex.,GoogleMaps) / map