CONTINGENCY PLANS
7.7 AIR CONDITIONING SERVICE

Description: Air conditioning to residential areas

Impact Rating: Very High

Consequences of resource failure:

§  Unable to regulate temperature and environment – patient and staff discomfort

Contingency strategy options:

§  Natural Ventilation – use fans and open windows

§  Use electric fans if electricity is working or supply of hand fans if necessary.

§  Keep windows closed if hot air or keep open if cool breeze available.

§  Keep blinds closed to keep sun / heat down.

§  Keep supply of cold drinks available to residents.

§  Locate Residents to the cooler side of the building

§  Hang wet sheets in doorways.

How long can operations continue in contingency mode: 2 Weeks

Trigger event/date to invoke the SOP: Air Conditioning Failure

Responsibility for implementing this strategy: Service Manager and Support Services Supervisor

Criteria for returning to normal operating mode: Restoration of air conditioning function

Can this strategy be tested if so how: No

Service Provider: Carrier Air Conditioning 47 753 277XXXXX; Mobile 0407 942 670 (Glen) XXXXX 0438 184 773 (Mark)

AIR CONDITIONING SERVICE SCHEDULE

Problem / Impact / Contingency / Task / Start date / End date / Actioned by
Air Conditioning Failure / Unable to regulate temperature and environment / §  As per guidelines / §  Evaluate compliance / §  / §  / § 
§  Use natural ventilation / open windows / doors / §  Open windows / doors / §  / §  / § 
§  Portable Air Conditioning units / §  Determine number of units needed in a priority list / §  / §  / § 
§  Source supply and cost of purchase / hire of units / §  / §  / § 
§  Arrange emergency supply process / §  / §  / § 
§  Use fans / §  Estimate number of fans in facility / §  / §  / § 
§  Determine priority sites for use of fans / §  / §  / § 
§  Distribute fans to priority sites / §  / §  / § 
7.8 ELECTRICITY SUPPLY

Description: Supply of electricity to all sites

Impact Rating: Extreme

Consequences of resource failure:

§  Inability to supply normal services to the Facility.

§  Facilities/Equipment not functioning:, lighting, refrigeration, cooking, cool-room, computers, alarms, fire doors, smoke doors, laundry machines, lifters, telecommunication, air-conditioning & electric beds.

Contingency strategy options:

§  Obtain emergency power generation.

§  See specific alternatives for providing essential services for all occupants of the Facility.

How long can operations continue in contingency mode: 24 hours

Trigger event/date to invoke the SOP: Electricity supply disruption.

Responsibility for implementing this strategy: Service Manager

Criteria for returning to normal operating mode: Resumption of electricity supply of a period greater than 15 minutes.

Can this strategy be tested if so how: No

Emergency Ergon Power Supplier Telephone Number to report life threatening situations or receive information regarding power outages:

Ergon Power Suppler Account Number Garden Settlement HomeXXXX: 66526949

ELECTRICITY SUPPLY SCHEDULE

Problem / Impact / Contingency / Task / Start date / End date / Actioned by
Electricity Failure / Inability to supply normal services to all sites / §  Emergency power generation / §  Ensure emergency generator supply to site – contact electrician / § 
/ §  / § 
§  Priority sites for power supply is the cold room / §  / §  / § 
§  Ascertain L/per hour fuel use of generator / §  / §  / § 
§  Ensure fuel supplies available and appropriate storage available / §  / §  / § 
§  Confirm essential equipment con-nected to generator power points / §  / §  / § 
§  Rely on gas services/appliances / §  Adapt work tasks to these services / §  / §  Normal supply / § 
§  Transfer patients out / §  Identify Patients for transfer / §  / §  Normal supply / § 
§  Use alternate emergency generator / §  Liaise with SES for priority use of generator / §  / §  / § 
Contingency failure / §  Close Facility / §  Transfer Residents out & close facility. Identify potential facilities/sites to transfer Residents to / §  Contingency failure / §  Normal supply / § 
§  Staff Education / §  Educate staff on contingency arrangements / §  / §  / § 
7.9 MEDICAL GASES

Description: Supply of Bottled Oxygen.

Impact Rating: Extreme

Consequences of resource failure: Inability to supply bottled oxygen to Residents in need.

Contingency strategy options:

§  Stockpile gas supplies

§  Consider accessing medical gas from The TownsvilleLocal Hospital .

How long can operations continue in contingency mode: 2 Weeks

Trigger event/date to invoke the SOP: Notification from supplier of loss of continuous supply

Responsibility for implementing this strategy: Service Manager and Support Services Supervisor

Criteria for returning to normal operating mode: Notification from supplier that supplies have returned to normal.

Can this strategy be tested if so how: No

Service Provider: Air LiquidSupplier, Telephone: 4728 8277XXXX; Fax Number 4728 8977XXXX

The TownsvilleLocal Hospital: 47 961 111 XXXX speak with Director of Nursing or nominated deputy

TGS/WH&S/Emergency Responses/Emergency Responses Contingency Plans Developed October 2007 2/28

Revised Dec 2008; Feb 2009

The Garden Settlement Pallarenda

MEDICAL GASES SCHEDULE

Problem / Impact / Contingency / Task / Start date / End date / Actioned by
Loss of medical gas supply / Unable to supply medical gases for therapeutic use / §  Stockpile bottled supply of medical gases / §  Identify priority sites for use of medical gases (incl home O2 supply) / §  / §  / § 
§  Estimate usage of medical gases per week / § 
/ § 
/ § 
§  Stockpile for at least two weeks without supply / §  / §  / § 
§  Distribute bottled gases to priority sites / §  / §  / § 
§  Use O2 concentrators where applicable / §  Identify / source / cost O2 concentrators / §  / §  / § 
§  Identify sites for use / §  / §  / § 
§  Priority use of medical gases / §  Identify Residents for priority use / §  / §  Normal supply / § 
§  Transfer Residents out / §  Identify Residents for transfer / §  / §  Normal supply / § 
§  Staff Education / §  Educate staff on medical gas use and contingency / §  / §  / § 
7.10 MOTOR VEHICLE FUEL

Description: Supply of Petrol for Garden Settlement Home vehicles.

Impact Rating: Medium

Consequences of resource failure: If suppliers have difficulty with pumps etc. this will impact on outings for Residents and transporting Residents to medical appointments, work activities of the maintenance staff

Contingency strategy options:

§  Transfer fuel from non essential to essential vehicles if supplies become severely diminished

How long can operations continue in contingency mode: 7 Days

Trigger event/date to invoke the SOP: Loss of supply of Petrol.

Responsibility for implementing this strategy: Support Services Supervisor

Criteria for returning to normal operating mode: Notification from supplier that supplies have returned to normal.

Can this strategy be tested if so how: No

Locations/Providers: Contract suppliers: Caltex XXXX

MOTOR VEHICLE FUELS SCHEDULE

Problem / Impact / Contingency / Task / Start date / End date / Actioned by
Motor Vehicle Fuels / Loss of supply, inability to transport / §  Vehicles at capacity fuel level at all times / §  Ensure all vehicles full of fuel / §  / §  / §  SSS
§  Alternate fuel supply / §  Source / cost alternate fuel supply / §  / §  / §  SSS
§  Ration fuel to essential vehicles - UTE / §  Transfer fuel to - UTE / §  Loss of supply / §  Normal supply / §  SSS
§  Staff education / §  Educate staff on contingency / §  / §  / §  SSS
7.11 MAIN GAS SUPPLY

Description: Supply of Main Gas via gas cylinder – supplier: Origin GasXXXX

Impact Rating: Extreme

Consequences of resource failure:

§  Inability to supply hot water to Residents for bathing etc.

§  Inability to supply warm & hot water for laundry & serveries.

§  Inability to cook full range of meals

Contingency strategy options:

§  Patients to go without Showers/Baths for up to 3 days

§  Use of disposable linens.

§  Use of disposable crockery & cutlery.

§  Offer meals made via electrical means

§  Use of Triple Care or other non-water based bathing products

How long can operations continue in contingency mode: 1 Day

Trigger event/date to invoke the SOP: No delivery of gas.

Responsibility for implementing this strategy: Service Manager / Support Services Supervisor

Criteria for returning to normal operating mode: Delivery of gas supply.

Can this strategy be tested if so how: Yes – Disconnect gas supply and run in contingency mode.

Locations/Providers: Origin Gas 132 462XXXX Phone No. XXXX

GAS SUPPLY SCHEDULE

Problem / Impact / Contingency / Task / Start date / End date / Actioned by
Loss of natural gas supply / Loss of gas supply to relevant sites / §  Reduce use of gas to essential services / §  Identify essential services for gas rationing / ability to isolate sites / §  / §  / § 
§  Initiate rationing of gas to essential services / §  Loss of supply / §  Normal supply / § 
§  Ensure gas tanks are at capacity storage (if available) / §  Arrange for supplier to fill storage tanks / §  / §  / § 
Unable to provide hot water / §  Heat water with alternate energy source – solar panels to A, E, M Blocks / §  Identify alternate energy sources for heating. Use showers in A, E, M Blocks where water is heated using solar power / §  / §  / § 
§  Ensure solar hot water booster is activated / § 
/ §  / § 
§  Wash / clean with cold water / §  Identify cleaning processes that can use cold water / §  / §  / § 
§  Initiate cold water cleaning regime / §  Loss of supply / §  Normal supply / § 
§  Identify cold water washing regime for patient hygiene / §  / §  / § 
§  Initiate cold water washing regime / §  Loss of supply / §  Normal supply / § 
§  Wash patients with hot water prior to loss of supply / §  / §  loss of supply / § 
§  Use Bag Baths or other non-water based hygiene product for Resident care / §  / §  loss of supply / § 
§  / §  Use bottled hand sanitizer lotion / §  / §  / § 
§  Staff Education / §  Educate staff on contingency plans / §  / §  / § 
7.12 SECURITY

Description: Staff and Patient security systems.

Impact Rating: Medium

Consequences of resource failure:

§  Failure of security and surveillance systems will prevent buildings from being automatically protected. Staff and patient security risks increased.

Contingency strategy options:

§  Increase security in areas where door locks do not work.

§  Adequate staff to prevent Residents from absconding From secure unit

How long can operations continue in contingency mode: 1 week

Trigger event/date to invoke the SOP: Failure of security system

Responsibility for implementing this strategy:

§  Maintenance Supervisor

§  Service Manager

Criteria for returning to normal operating mode: Rectification of security system

Can this strategy be tested if so how: Yes – Trial run of locking doors etc. calling police to ensure all items work.

Locations/Providers: Security Company: Southern Cross ProtectionXXXX – Telephone: 3722 4028XXXX

Townsville Local Police: 47 607 777XXXX

Emergency: 0-000

SECURITY SCHEDULE

Problem / Impact / Contingency / Task / Start date / End date / Actioned by
Security systems / Loss of ability to secure site and protect staff and patients / §  / §  Security staff patrol site / building perimeter / §  / §  / § 
§  Source supply / cost of extra / alternate security staff / §  / §  / § 
§  Roster extra staff for escorts / §  Ensure availability of extra staff / §  / §  / § 
§  Staff education / §  Educate staff on contingency plan / §  / §  / § 
7.13 SEWERAGE

Description: Sewerage disposal systems

Impact Rating: Medium

Consequences of resource failure:

§  Toilets, drains will stop flowing creating health hazard.

§  Build up of waste will prevent patient treatment

Contingency strategy options:

§  Relocate Residents

§  Pump sewerage away from site

§  Seek advice from local Government

§  Seek advice from Public Health Unit

How long can operations continue in contingency mode: 1 Week

Trigger event/date to invoke the SOP: Advice from local authority (local council) of failure of systems

Responsibility for implementing this strategy:

§  Maintenance Supervisor

Criteria for returning to normal operating mode: Reinstatement of sewerage facilities/services

Can this strategy be tested if so how: No

Locations/Providers: Townsville CityLocal Council, Telephone: 47 279 000XXXX

CitiwasteWaste Collection Supplier: Telephone: 47 712 544XXXX

Hazardous Waste: Telephone: 47 725 663XXXX

Environmental Health: Telephone: 47 279 003XXXX

CitiwaterWater Supplier: Telephone: 47 278 950XXXX

SEWERAGE SCHEDULE

Problem / Impact / Contingency / Task / Start date / End date / Actioned by
Sewerage service / Unable to dispose of waste products / §  Alternate toilet facilities / §  Identify alternate toilet facilities / devices ie; portaloos / §  / §  / § 
§  Identify amount of alternate facilities / devices needed and priority use areas / §  / §  / § 
§  Source supply / cost of alternate devices / §  / §  / § 
§  Develop protocols for Resident use of alternate facilities / §  / §  / § 
§  Initiate use of alternate facilities / devices / §  / §  Normal service / § 
§  Staff education / §  Educate staff on contingency plans / §  / §  / § 

7.14 WATER SUPPLY

Description: Water supply to all facilities