CROW Web - Outage Request Report
PSE Transmission Outages /
Business Units: / All Business Units
Date Range: / all dates on or before 03/07/2018
Equipment Classes: / Bus, Capacitor, Circuit Breaker, Circuit Switcher, Disconnect Switch, Switchgear, Transformer, Transmission Circuit
Generate By: / Control Center: PSE Transmission Control Center

OUTAGE REQUESTS

Outage #/
Revision/
Status / Station/
Circuit/Equipment / Requested Date Range/
Duration / From/To/Type / Required Approvals / Path(s) Affected / Requested By/
Reason/Priority
Path / OTC Impact / WECC OTC
Seas. Ratings
1-00516964
Revision #6
Implemented Unverified / Sedro Woolley - Bellingham #4 115 kV Line : Norlum - Alger OOS / 2017/10/09 to
2017/12/22
74.38 Days / 08:00 - 16:00
Noncontinuous / Parker, David
Transmission rebuild
1-00521773
Revision #1
Implemented Verified / Berrydale 115kV 142_M, Berrydale 115kV SW142_CAP, Berrydale Capacitor Bank OOS / 2017/10/18 to
2018/02/28
133.25 Days / 11:00 - 16:00
Continuous / Baker, Wesley
Berrydale Capacitor Bank unavailable during switch repair and panel upgrade. Isolation point is Berrydale 142 main bus disconnect.
1-00518509
Revision #6
Implemented Verified / Talbot Hill 230kV 7627, Talbot Hill 230kV 7629, Talbot Hill 230kV 7630, Talbot Hill 230kV 7631, Talbot Hill 230kV 7633 OOS / 2017/10/30 to
2018/10/31
366.17 Days / 12:00 - 16:00
Continuous / Parker, David
Talbot Hill 230kV East Bus project
1-00524496
Revision #6
Implemented Unverified / Portal Way P801 BP&C OOS / 2017/11/06 to
2017/12/15
39.33 Days / 08:00 - 16:00
Continuous / Parker, David
Breaker replacement
1-00523015
Revision #8
Implemented Unverified / Beverly Park - Cottage Brook 115 kV Line : Lake Leota - Cottage Brook OOS / 2017/11/27 to
2017/12/15
18.33 Days / 08:00 - 16:00
Return Evenings and Weekends / Parker, David
Replacing poles
1-00530834
Revision #3
Implemented Unverified / Berrydale - Krain Corner 115 kV Line : Pipe Lake - Four Corners OOS / 2017/12/05 to
2017/12/13
8.31 Days / 07:30 - 15:00
Return Evenings and Weekends / Yoon, Chris
Relocate pole
1-00519814
Revision #9
RC OPA D+1 Confirmed / Shuffleton - President Park 115 kV Line : Shuffleton - Highlands OOS / 2017/12/07 to
2017/12/11
4.33 Days / 08:00 - 16:00
Return Evenings and Weekends / Parker, David
Relocate poles (Th, M-Tu)
1-00530866
Revision #2
RC OPA D+1 Confirmed / March Point 115kV 7616 BP&C OOS / 2017/12/07 to
2017/12/07
60 Mins / 09:00 - 10:00
Continuous / Parker, David
Breaker gas analysis
1-00531785
Revision #2
RC OPA D+1 Confirmed / Sammamish 401 BP&C, OAT, Sammamish 488_BUS_SEC BP&C, OAT, Sammamish 53_BUS_TIE BP&C, OAT, Sammamish 7067_BUS_SEC BP&C, OAT OOS / 2017/12/07 to
2017/12/07
60 Mins / 10:00 - 11:00
Noncontinuous / Parker, David
Breaker profiling, one at a time
1-00530860
Revision #3
RC OPA D+1 Confirmed / Greenbank - Maxwelton 115 kV Line : Greenbank - Freeland Tap OOS / 2017/12/07 to
2017/12/07
2 Hours / 11:00 - 13:00
Continuous / Parker, David
Gas analysis
1-00530830
Revision #1
TOP Confirmed / Berrydale - Krain Corner 115 kV Line : Berrydale - Pipe Lake OOS / 2017/12/08 to
2017/12/08
10.5 Hours / 07:30 - 18:00
Continuous / Yoon, Chris
cell site
1-00530837
Revision #1
TOP Confirmed / Berrydale P7330 OAT, BP&C, Berrydale P7331 OAT, BP&C, Berrydale P7333 OAT, BP&C OOS / 2017/12/08 to
2017/12/09
1.33 Days / 08:00 - 16:00
Noncontinuous / Yoon, Chris
Testing breakers with new RTU. OAT
1-00530827
Revision #2
TOP Confirmed / Alderton - Fredrickson #2 115 kV Line : Alderton - Hemlock OOS / 2017/12/09 to
2017/12/09
10.5 Hours / 07:30 - 18:00
Continuous / Yoon, Chris
cell site
1-00531928
Revision #1
TOP Confirmed / White River - Krain Corner #1 55 kV Line : Lake Tapps - White River, White River 115/55kv Bank OOS / 2017/12/10 to
2017/12/10
15 Mins / 10:00 - 10:15
Continuous / Parker, David
White River 55kV bus lockout relay trip test
1-00531748
Revision #1
TOP Confirmed / Lake Tradition - Sahalee 115 kV Line : Plateau - Pine Lake OOS / 2017/12/11 to
2017/12/12
1.46 Days / 07:00 - 18:00
Return Evenings / Parker, David
Cell site
1-00504375
Revision #5
RC Short-Range Confirmed / Olympia-St Clair 1 230KV Line, Olympia: PCB A-1770, Olympia: PCB A-358 OOS / 2017/12/11 to
2017/12/11
7 Hours / 07:30 - 14:30
Continuous / BPA, Dart
#1134382 DISCONNECT SERVICE
1-00530533
Revision #5
RC Short-Range Confirmed / Novelty Hill 115kV 7256 BP&C OOS / 2017/12/11 to
2017/12/13
2.35 Days / 07:30 - 16:00
Continuous / Parker, David
Replacing SF6 gas
1-00531715
Revision #1
TOP Confirmed / O'Brien - Metro Renton 115 kV Line : Boeing Longacres Tap - Metro Renton OOS / 2017/12/13 to
2017/12/13
6 Hours / 09:00 - 15:00
Continuous / Parker, David
Breaker maintenance
1-00529224
Revision #4
RC Short-Range Confirmed / Christopher - Starwood 115 kV Line : Marine View - Weyerhauser Tap OOS / 2017/12/14 to
2017/12/21
7.42 Days / 07:30 - 17:30
Return Evenings and Weekends / Parker, David
Replacing poles
1-00531716
Revision #1
TOP Confirmed / Talbot Hill - Metro Renton 115 kV Line : Metro Renton - Grady OOS / 2017/12/14 to
2017/12/14
6 Hours / 09:00 - 15:00
Continuous / Parker, David
Breaker maintenance
1-00531784
Revision #1
TOP Confirmed / Mount Si 7405 BP&C, OAT, Mount Si 7406 BP&C, OAT, Mount Si 7407 BP&C, OAT, Mount Si 7408 BP&C, OAT, Mount Si 7409 BP&C, OAT, Mount Si 7410 BP&C, OAT OOS / 2017/12/14 to
2017/12/14
30 Mins / 10:00 - 10:30
Noncontinuous / Parker, David
Breaker profiling, one at a time
1-00529544
Revision #4
TOP Confirmed / Alderton - Electron Heights 115 kV Line: Alderton - Rhodes Lake, Alderton - Fredrickson #2 115 kV Line : Alderton - Hemlock, White River - Alderton #2 115 kV Line : Gardella Tap - Alderton, Alderton Capacitor Bank 3, Alderton Capacitor Bank 4 OOS / 2017/12/16 to
2017/12/17
1.33 Days / 08:00 - 16:00
Continuous / Parker, David
Commissioning new 230/115kV transformer
1-00531760
Revision #2
TOP Confirmed / Talbot Hill - Berrydale #1 115 kV Line : Glencarin - Lake Meridian OOS / 2017/12/18 to
2017/12/20
2.48 Days / 06:30 - 18:00
Return Evenings / Parker, David
Relocate pole
1-00531763
Revision #2
TOP Confirmed / Lake Tradition - Sahalee 115 kV Line : Sahalee - Plateau OOS / 2017/12/18 to
2017/12/18
11 Hours / 07:00 - 18:00
Continuous / Parker, David
Cell site
1-00525279
Revision #3
TOP Proposed / Sammamish - Moorlands #1 115 kV Line : Inglewood - Juanita OOS / 2017/12/18 to
2017/12/22
4.44 Days / 07:30 - 18:00
Return Evenings / Parker, David
Cell site
1-00530824
Revision #3
RC OPA D+1 Confirmed / Portal Way P800 BP&C OOS / 2017/12/18 to
2017/12/29
11.33 Days / 08:00 - 16:00
Continuous / Yoon, Chris
Breaker replacement
1-00531773
Revision #2
TOP Confirmed / Berrydale - Lake Tradition #1 115 kV Line : Mirrormont - Lake Tradition OAT, Lake Tradition - Goodes Corner 115 kV Line : West Issaquah - NO Sw 7054 - Lake Tradition OAT, Lake Tradition - Mount Si 115 kV Line : Lake Tradition - Mount Si OAT, Lake Tradition - Pickering 115 kV Line : Lake Tradition - Pickering Tap OAT, Lake Tradition - President Park 115 kV Line : Lake Tradition - Lake McDonald Tap OAT, Lake Tradition - Sahalee 115 kV Line : Pine Lake - Lake Tradition OAT, Snoqualmie - Lake Tradition #2 115 kV Line : Snoqualmie - Lake Tradition OAT, Talbot Hill - Lake Tradition #1 115 kV Line : Maplewood - Lake Tradition OAT OOS / 2017/12/19 to
2017/12/19
2 Hours / 09:00 - 11:00
Continuous / Parker, David
Breaker profiling, one at a time
1-00531771
Revision #2
TOP Proposed / Sammamish - Moorlands #1 115 kV Line : Inglewood - Juanita OAT, Sammamish - Moorlands #1 115 kV Line : Juanita - Crestwood Tap OAT OOS / 2017/12/20 to
2017/12/20
30 Mins / 07:00 - 07:30
Noncontinuous / Parker, David
Breaker profiling, one at a time
1-00531910
Revision #1
TOP Confirmed / White River 230kV 7367 BP&C, White River 230kV 7394 BP&C, White River 230kV 7396 BP&C, White River 230kV 7398 BP&C, White River 230kV 7400 BP&C, White River 7369 BP&C OOS / 2017/12/20 to
2017/12/20
15 Mins / 08:30 - 08:45
Noncontinuous / Parker, David
230kV west bus lockout relay trip test
1-00531772
Revision #2
TOP Confirmed / Lakeside - North Bellevue 115 kV Line : Center - North Bellevue OAT, Lakeside - North Bellevue 115 kV Line : Lakeside - Center OAT OOS / 2017/12/20 to
2017/12/20
30 Mins / 09:00 - 09:30
Noncontinuous / Parker, David
Breaker profiling, one at a time
1-00531775
Revision #2
TOP Confirmed / Snoqualmie - Lake Tradition #2 115 kV Line : Snoqualmie - Lake Tradition OAT, Snoqualmie - Lake Tradition #2 115 kV Line : Snoqualmie Switch - Snoqualmie OAT, Snoqualmie - Mount Si 115 kV Line : Snoqualmie - Mount Si OAT, Snoqualmie - Novelty Hill 115 kV Line : Fall City Tap - Snoqualmie OAT, Snoqualmie Ph 1 115kV SW1313 OAT, Snoqualmie Ph 2 115kV SW7594 OAT OOS / 2017/12/20 to
2017/12/20
60 Mins / 12:00 - 13:00
Noncontinuous / Parker, David
Breaker profiling, one at a time
1-00531627
Revision #2
TOP Confirmed / White River - Alderton #4 115 kV Line : Edgewood Tap - Cedarhurst OOS / 2017/12/21 to
2017/12/21
8.5 Hours / 06:30 - 15:00
Continuous / Parker, David
Re-sag conductor
1-00531778
Revision #1
TOP Proposed / Beverly Park - Cottage Brook 115 kV Line : Lake Leota - Cottage Brook OAT, Cottage Brook - Moorlands 115 kV Line : Cottage Brook - Hollywood OAT, Sammamish - Novelty Hill - Cottage Brook 115 kV Line : Avondale - Cottage Brook OAT OOS / 2017/12/21 to
2017/12/21
3 Hours / 07:00 - 10:00
Noncontinuous / Parker, David
Breaker profiling, one at a time
1-00531783
Revision #2
TOP Confirmed / SCL Cedar Falls - Snoqualmie 115 kV Line : Rattlesnake Lake - Twin Falls OAT, Twin Falls - Hyak 115 kV Line : Twin Falls - Rockdale Tap OAT OOS / 2017/12/21 to
2017/12/21
30 Mins / 10:00 - 10:30
Noncontinuous / Parker, David
Breaker profiling, one at a time
1-00531761
Revision #1
TOP Proposed / Sammamish - North Bellevue 115 kV Line : Northrup - Bridle Trails OOS / 2017/12/27 to
2017/12/28
1.46 Days / 07:00 - 18:00
Return Evenings / Parker, David
Cell site
1-00531769
Revision #1
TOP Proposed / Sammamish - Moorlands #1 115 kV Line : Inglewood - Juanita OOS / 2017/12/27 to
2017/12/28
1.46 Days / 07:00 - 18:00
Return Evenings / Parker, David
Cell site
1-00531767
Revision #1
TOP Proposed / Novelty Hill - Sahalee 115 kV Line : Ames Lake Tap - Sahalee OOS / 2017/12/29 to
2017/12/29
8.5 Hours / 07:30 - 16:00
Continuous / Parker, David
Cell site
1-00531765
Revision #1
TOP Proposed / Cottage Brook - Moorlands 115 kV Line : Cottage Brook - Hollywood OOS / 2018/01/03 to
2018/01/03
11 Hours / 07:00 - 18:00
Continuous / Parker, David
Cell site
1-00523828
Revision #1
TOP Proposed / BPA Monroe - Novelty Hill 230 kV Line : BPA Monroe - Novelty Hill OOS / 2018/01/08 to
2018/01/08
8.5 Hours / 06:30 - 15:00
Continuous / Path 3 / /a / 3150 MW N->S
2000 MW S->N / Parker, David
Repair frayed conductor
1-00531629
Revision #1
TOP Proposed / SCL Cedar Falls - Lake Youngs 115kV Line Cedar Falls - Lake Youngs 115kV line OOS / 2018/02/01 to
2018/02/02
1.67 Days / 06:00 - 22:00
Continuous / Path 3 / /a / 3150 MW N->S
2000 MW S->N / Hickey, John
Pole Replacement @ 11/147 and 11/082 on the Cedar Falls - Lake Youngs 115kV line
Generated: 12/07/2017 05:05 for Parker, David / page 1 of 6