Low Pressure Sewer System Replaces

Septic System i n Lake Community

A. Lee Head, III, P.E. - Alan Plummer Associates, Inc.

Madelene R. Mayhall, E.I.T. - City of Fort Worth, Texas

Alan R. Tucker, P.E. - Alan Plummer Associates, Inc.

Jeffrey E. Caffey - Alan Plummer Associates, Inc.

Abstract

A uniquely challenging design of a low pressure sewer system to replace outdated septic systems on approximately 100 lake-front properties was completed as a demonstration project for the City of Fort Worth Water Department with partial funding from an Environmental Protection Agency Clean Lakes Program grant. The lots are owned by the City and leased to the home owner who owns all improvements to the lots. Many of the houses are over 50 years old and have multiple existing septic and gray water systems. Also, many of the houses do not meet current electrical or plumbing codes. These conditions required individualized analysis and design of the grinder pump system and the electrical connections. Resident input was important in producing a successful project. The Water Department cultivated new approaches to fee structures, service agreements and project development in providing sewer service to Lake Worth.

Introduction

The City of Fort Worth Water Department (Water Department) and Alan Plummer Associates, Inc. (APAI) faced the challenge of designing an innovative community sewer system around Lake Worth and demonstrating the viability of such a system. Replacing the septic tanks around the lake with a reliable sewer system was an integral part of the Lake Worth Clean Lakes Project, which has been partly funded by a grant from the Environmental Protection Agency (EPA). One of the goals of the Clean Lakes Project is to find creative and innovative means of protecting and improving the quality of the water in reservoirs. The Lake Worth Community Sewer System, which will provide service to approximately 100 lots along the north shore of the lower Lake Worth, will serve as a demonstration project for the feasibility of extending sewer service to the remainder of the lake as a creative solution for protecting the water quality in Lake Worth.

Since the City of Fort Worth owns the property around the lake and leases the land to the residents, the Water Department assumed the role of project developer in providing sewer service. This new role challenged the project team to think creatively to overcome the hurdles presented to them. Communicating with the residents was essential in producing a design that would stimulate their participation in the project. This paper describes the challenges encountered by the project team in selecting the type of sewer system used, developing the project and designing the grinder pump system.

Background

The City of Fort Worth has a unique relationship with the residents around Lake Worth. The lake, which was constructed circa 1914 as the City's first water supply lake, is located about 8 miles northwest of downtown Fort Worth. Figure 1 is a map of Lake Worth. Nearly half of the shoreline is residential. The City owns most of the lots and leases them to the residents. The area has a wide variety of houses. Many houses were first constructed in the 1930's as summer residences and have been added to over time. These houses have multiple septic systems, and in some cases structures have been constructed on top of existing septic tanks. Other houses have been constructed recently per modern building codes. Although the area is within the Fort Worth city limits, the residents have been relatively autonomous, relying on individual wells for water service, and on-site wastewater disposal. These factors made individual analysis of each lot a necessity in preparing the system design.

In additional to storing drinking water, the lake is a popular recreation area. Several shallow aquifers are in the lake vicinity. The majority of individual residents use septic tanks for on-site wastewater disposal. Many of the septic systems were constructed prior to the 1980's and do not meet the current Texas Natural Resources Conservation Commission (TNRCC) standards, and many have experienced recent operational problems. Elimination of the septic tanks will minimize a potential health problem resulting from contamination of shallow wells and prevent probable pollution to the lake from occurring. The overall purpose of the Lake Worth Clean Lakes Project, which was funded through the TNRCC by the U. S. Environmental Protection Agency (USEPA), was to restore the quality of drinking water in the lake and control sources of pollution that could affect the water quality. In February 1990, the Water Department and APAI completed the first phase of the project, which was a diagnostic/feasibility study that outlined programs to meet the goals of the project. The recommendations of the feasibility study include the design and construction of a Lake Worth Community Sewer System Demonstration Project. In 1993, the Water Department submitted an application to the USEPA and received funding for the second phase of the project, the implementation of the diagnostic/feasibility study recommendations. The Lake Worth Community Sewer System is one of eight tasks included in the funded program. The sewer system is scheduled to be completed by September 1, 1997, in order to receive full funding from the grant.

The Lake Worth Community Sewer System is a representative project to demonstrate the viability of an innovative sewer system as a cost effective means of serving the remainder of the lake's residential areas. Three primary candidate areas around the lake were evaluated for feasibility as a demonstration project. In determining and ranking the three primary candidate areas, consideration was given to the density of the area, proximity to the lake, proximity to the City's existing wastewater collection system and the historical operational problems with on-site wastewater disposal systems. Cahoba Drive was selected as the demonstration site. There are 100 lots along Cahoba Drive, and all the lots except for three are located on the lake shoreline.

System Selection

Three different community sewer systems were evaluated based on advantages, disadvantages, and construction costs. The system alternatives were as follows:

· Low pressure small diameter sewer system with effluent pumps or grinder pumps

· Conventional gravity system with effluent pumps or grinder pumps

· Vacuum sewer system

Alternative 1 - Low Pressure Small Diameter Sewer System

A low pressure small diameter sewer system consists of a small diameter (minimum 2 inches) force main that is typically installed within the road right-of-way (ROW). The system requires installing a septic tank effluent pump or a grinder pump at each residence to convey wastewater to the low pressure sewer system. The opinion of probable construction cost for a low pressure, small diameter sewer system was $1,300,000.


Advantages

· pipe sizes from 2 inches to 6 inches

· layout independent of topography

· reduced excavation compared to gravity

· sewer system infiltration greatly reduced

· eliminates manholes

· requires less power than vacuum system

· lower construction costs than other alternatives

Disadvantages

· effluent pump or grinder pump needed at each residence

· electrical power required

· air release valves needed

· flushing connections required

· periodic pumping of septic tank for effluent pump system

· power outage disturbs service

Alternative 2 - Conventional Gravity System With Effluent Pumps Or Grinder Pumps

This alternative combines a conventional gravity system with an effluent pump or grinder pump system as discussed above. An effluent pump or grinder pump would be installed at each residence and discharge through a one and a half inch diameter force main into a gravity sewer system located in the road ROW. The opinion of probable construction cost for a gravity sewer system was $2,200,000.

Advantages

· lower operational cost for gravity line compared to low pressure system

· flushing of system not required

Disadvantages

· minimum pipe size of 8 inches

· deep manholes

· additional lift station required

· higher construction costs

· effluent or grinder pump required at each residence

· electrical power required

Alternative 3 - Vacuum Sewer System

A vacuum sewer system utilizes a partial vacuum to transport sewage through the collection system. Vacuum sewer systems include a central vacuum station, which maintains the system at a sub-atmospheric pressure, with a small diameter vacuum pipeline located in the road ROW. Service connections are made to each residence and a holding tank replaces the septic tank (much like the grinder pump system). A vacuum valve located in the holding tank allows rushing air from the service connection to transport the sewage to the central vacuum station. The central vacuum station operates 24-hours a day. The opinion of probable construction cost for a vacuum sewer system was $2,000,000.

Advantages

· electrical power not needed at each residence

· reduced excavation compared to gravity sewer system

· grade and depth not critical

· exfiltration virtually impossible

· manholes not needed

Disadvantages

· electrical power required at central vacuum station

· vacuum valves have a shorter life than pumps

· higher energy consumption than other alternatives

· major odor problem at central vacuum station

· vacuum loss requires immediate repair

Alternative No. 1 Selected

Based on the projected construction costs and the associated advantages, the low pressure small diameter sewer system was selected.

Pump Selection

Once the system was selected, the next step was to evaluate the type of pumps available to optimize the function of the low pressure system. Septic tank effluent pumps and grinder pumps were compared for use in the system.

Septic Tank Effluent Pump — The septic tank effluent pump is installed in the septic tank. The concept is that approximately 80 per cent of the solids fall out in the septic tank and partially treated wastewater effluent is pumped to the low-pressure sewer system through a one and a half inch diameter force main. Keeping a majority of the solids in the septic tank helps prevent line blockage in the low pressure sewer system. With the septic tank effluent pump system, the septic tanks will require periodic pumping of solids. Effluent pumps require less power to operate, they have approximately a $300 initial cost savings compared to a grinder pump, and they pump less solids. However, many septic tanks do not meet current state and local design requirements, and, because a septic tank requires periodic pumping of solids, which requires a removable lid, the system can not be water tight.

Grinder Pump — The concept of a grinder pump system consists of replacing the septic tank with a holding tank. All solids introduced into the sewage holding tank are ground and then pumped to the low-pressure sewer system. Each time the grinder pump is activated, the contents of the holding tank are removed. Grinder pumps eliminate the septic tank, so that there is no longer any need to pump solids from septic tank, and since they are watertight, they greatly reduce infiltration. The grinder pump would make bidding the project easier for the Contractors, because, unlike the effluent pump where each septic tank installation is different, each grinder pump station would be identical. Also, with the smaller tank capacity, grinder pumps pump fresher sewage, reducing odor problems. The Water Department elected to abandon the use of all septic systems along the project and opted to install as uniform a system as possible along the "one-of-a-kind" street. The grinder pump system was selected because it would simplify bidding and construction, reduce inflow and infiltration into the holding tank and, since each grinder pump station is identical, provide a uniform system.

Project Development

Coordination of this project required communicating with the residents. Several meetings were held with the Lake Worth Civic Club and residents along Cahoba Drive to present the project, encourage resident participation, receive input and discuss alternatives.

The Water Department agreed to a 50 percent matching grant under the EPA Clean Lakes Program. Initially, it was proposed that residents pay for any construction on their lot to connect to the innovative system. Over several years, this position evolved to a point where all costs associated with the construction of the force main, the installation of the grinder pump stations, the household connection to the station, and the service connection from the grinder pump station to the force main were paid for with the grant. This expanded the scope of the Water Department's participation from the original intent of the task, and tested the bounds of the budget.

Resident Participation and Fees

The Water Department could not require the residents to participate in the project. However, the City decided that connection to available water or wastewater service would be a stipulation in the future sale of the land. Grant funding made it quite advantageous to the residents to participate. The system as designed is operational at 50 percent resident participation. The Water Department was willing to install the system if only 20 percent of the residents participated. At the time of the start of construction, over 90 percent of the residents had committed to participate in the project.

The Water Department required the homeowners to pay Wastewater Tap and Impact Fees as a commitment to participate in the project. The City ordinance Wastewater Tap Fees were $850.00 and Impact Fees were $580.20, with the total cost to the resident totaling $1,430.20. No construction costs associated with the project were charged to the homeowner. The Grant fund and the Water Department paid approximately $14,800.00 per lot in construction costs for the installation of the collection system, grinder pump, and for the plumbing and electrical connections.

Once the Water Department had established commitment from the residents to participate in the project, the issue of how to charge for wastewater service had to be resolved. The customary wastewater service charge is based on the customer's metered water volume. In this case, the residents were using private water sources. Several alternative methods were considered. These alternatives included metering pump flow rates, pump run time meters, a volume per capita fee, and a dwelling volume fee. The Water Department decided to bill based on a flat 900 cubic feet per month volume charge until metered City water service is available.

Resident Ownership of Pumps