FAA - 7460 or CSPP Construction Permit No.__________________
Date Received:___________________ DFW Skire No.
DALLAS/FORT WORTH INTERNATIONAL AIRPORT BOARD
Administration – Phone (972) 973-1781 / Fax – (972) 973-1780
Design, Code and Construction Department
3003 South Service Road, P.O. Box 612008, DFW Airport, TX 75261-2008
AIRSPACE STUDY APPLICATION
Applicant: Contact Name: _________________ ________
Email address: Phone: Fax: ________
DFW Project Manager: Phone: ________
Project Location (including Airport Emergency Map grid numbers): ________
________
Project Description (scope of work including renovation of existing facilities): ________
________
What is the purpose of this study? _____________________________________________________________________________________________
_________________________________________________________________________________________________________________________
Is this project subject to federal funding? Yes________ No________
This project is______ is not ______ subject to general conformity. If not, please explain:___________________________________________________
_________________________________________________________________________________________________________________________
Airspace studies are required by the Federal Aviation Administration (FAA) for changes to the Airport Layout Plan (ALP) and for the use of construction equipment. The FAA processes airspace study applications for conformance with environmental regulations and to determine if the project will have an impact on air operations, navigation aids or radio transmissions. Each application will require a minimum of 60 days for FAA review. A construction permit cannot be issued before the Building Official receives the airspace study from the FAA.
Attach to this application, a project location map and a site plan illustrating key coordinate points for site perimeter, building perimeter and other site improvements such as light poles and signs. Complete Pages 2 and 4 pertaining to air emissions and Page 3 for key coordinate points. To obtain base map and other information, contact Naresh Shahani at (972) 973-1772 or email to .
Construction Schedule: Start Date: _______ End Date: ______________
Crane Schedule: Start Date: ________ End Date: _______
Location: ***
A. Impacted Runway(s) ________/_ C. Runway Elevation AMSL ________/_______
B. Distance from Runway End * ________/_ D. Perpendicular Distance ** ________/_______
(Indicate in NAD 1983 (Geodetic, Lat./Long.) coordinates and attach location plan and site plan)
* Measured parallel to runway from proposed structure to nearest runway threshold.
** Measured from proposed structure to runway centerline.
*** There may be more than one runway impacted by this project. Provide information on runways nearest proposed project.
For CSPP: Latitude _____________ Longitude _____________ MSL at Point (ground) ___________ Object Height ____________
Page 1
(4/17)