Present:

Green Woodlands(GWL):Bob and Sandy Green

Bruss Construction Inc (BCI):Michael Bruss, Chris Simpkins

Paradigm Builders (PB):Ed Levin

Mink Hill Timber Frames (MH):Kyle Whitehead

Stantec formerly DuFresne-H):Bob Kischko, Meagan

Banwell Architects:(BA):Jeremiah Goulet, Stu White

cc: Bob Green; Sandy by post; Quentin Mack; Paul Leveille; James Petersen (PEI), Ben Goss (PEI), Andy Arsenault (PEI), Bob Kischko (Stantec), John Freed (Stantec), Meagan (Stantec), Michael Bruss (BCI), Chris Simpkins (BCI), Ed Levin (Paradigm), Henri Fennell (Foam-Tech), Kyle Whitehead (Mink Hill), Jim Stockman (J&M Lighting)

Action / Mtg/itm /

Item

BA /
Masonry heater:
5-22-Update: not discussed at meeting: possible team shaping up: core elements and heater design by Erik Nilsen, per recommendation from Steve Busch of Maine – he can meet schedule; heater construction by Lance Brownell – says he can work with the schedule. Steve Busch has sent some sketches which are a good start.
PEI / 11.3 / OPEN: Review updates from PEI: question for PEI: should there be 2 zones at main level, open space?
New Business
ALL / 13.1 / Site Plan:
  • Updated site plan by BCI reviewed.
  • Clivus: gravity system preferred
  • Erosion control: 3 yr old hardwood chip pile available; check for adequate vol.
  • Revise route of underground elec to Little Barn per Sandy’s comment & replace wall where disturbed
  • Located underground propane tank, much discussion: seems prudent to locate near drive to Little Barn so delivery does not go down the driveway; tank to feed boiler and generator
  • Generator: choose soon, needs to be available for construction
  • Is bio-diesel generator feasible at Little Barn? Needs heat, but if in a super-super ins cavity is it possible? Perhaps a below grade cavity? Would be cool.
  • House & drive staked out per revised site plan; all review;

13.2 / Timber Frame Meeting: Quentin, Kyle, Michael, Chris, Ed: discuss details, needed additional material, search for special curved material for braces, ties etc.
13.3 / Architectural:
BA
STANTEC, GWL /
  • Living Room: Change SE doors to inswing double
  • At 1 hr walls in basement add board sheathing (for nailing) and drywall
  • Locate satellite dish on sw end of monitor per discussion
  • BA to provide longitudinal site section (looking to Cummins Pond)
  • Add back partial partition in cellar @ composters per discussion
  • Add interior strapping 2’ o.c. at durisol fdn wall per as discussed
  • Balcony Extension & 2nd Floor Bedroom Revision reviewed and approved.
  • Extend “crow’s nest” to D line, slatted floor boards to admit light
  • Cathedral ceiling at upstairs bathrooms approved
  • Tile at tub walls: need tile samples: find tiles made of recycled material
  • Battery bank: how big? Stepped rack? Locate on SE wall
  • Saplings for balusters?

STANTEC / 13.4 / Electrical: Bob Kischko introduces Meagan who will be involved during construction Phase.
STANTEC / 13.5 / Hydro: Bob K to propose engineer within Stantec with appropriate small scale hydro experience - ASAP
13.6 / Next Meeting: Not discussed but we suggest Week of May 29, either Tuesday afternoon or Thursday. Need to have HVAC on menu. Meeting most likely to be at SITE – from now on.