Green Woodlands – Minutes
6 South Park Street Lebanon, New Hampshire 03766tel: 603-448-3778 fax: 603-443-5555
PO Box 830, 16 State Street Montpelier, Vermont05602tel: 802-223-5551 fax: 802-223-5552
Green Woodlands
MEETING NOTES – Meeting #13
Date: May 22, 2006 – AT GREEN WOODLANDS
Present:
Green Woodlands(GWL):Bob and Sandy Green
Bruss Construction Inc (BCI):Michael Bruss, Chris Simpkins
Paradigm Builders (PB):Ed Levin
Mink Hill Timber Frames (MH):Kyle Whitehead
Stantec formerly DuFresne-H):Bob Kischko, Meagan
Banwell Architects:(BA):Jeremiah Goulet, Stu White
cc: Bob Green; Sandy by post; Quentin Mack; Paul Leveille; James Petersen (PEI), Ben Goss (PEI), Andy Arsenault (PEI), Bob Kischko (Stantec), John Freed (Stantec), Meagan (Stantec), Michael Bruss (BCI), Chris Simpkins (BCI), Ed Levin (Paradigm), Henri Fennell (Foam-Tech), Kyle Whitehead (Mink Hill), Jim Stockman (J&M Lighting)
Action / Mtg/itm /Item
BA /Masonry heater:
5-22-Update: not discussed at meeting: possible team shaping up: core elements and heater design by Erik Nilsen, per recommendation from Steve Busch of Maine – he can meet schedule; heater construction by Lance Brownell – says he can work with the schedule. Steve Busch has sent some sketches which are a good start.
PEI / 11.3 / OPEN: Review updates from PEI: question for PEI: should there be 2 zones at main level, open space?New Business
ALL / 13.1 / Site Plan:
- Updated site plan by BCI reviewed.
- Clivus: gravity system preferred
- Erosion control: 3 yr old hardwood chip pile available; check for adequate vol.
- Revise route of underground elec to Little Barn per Sandy’s comment & replace wall where disturbed
- Located underground propane tank, much discussion: seems prudent to locate near drive to Little Barn so delivery does not go down the driveway; tank to feed boiler and generator
- Generator: choose soon, needs to be available for construction
- Is bio-diesel generator feasible at Little Barn? Needs heat, but if in a super-super ins cavity is it possible? Perhaps a below grade cavity? Would be cool.
- House & drive staked out per revised site plan; all review;
13.2 / Timber Frame Meeting: Quentin, Kyle, Michael, Chris, Ed: discuss details, needed additional material, search for special curved material for braces, ties etc.
13.3 / Architectural:
BA
STANTEC, GWL /
- Living Room: Change SE doors to inswing double
- At 1 hr walls in basement add board sheathing (for nailing) and drywall
- Locate satellite dish on sw end of monitor per discussion
- BA to provide longitudinal site section (looking to Cummins Pond)
- Add back partial partition in cellar @ composters per discussion
- Add interior strapping 2’ o.c. at durisol fdn wall per as discussed
- Balcony Extension & 2nd Floor Bedroom Revision reviewed and approved.
- Extend “crow’s nest” to D line, slatted floor boards to admit light
- Cathedral ceiling at upstairs bathrooms approved
- Tile at tub walls: need tile samples: find tiles made of recycled material
- Battery bank: how big? Stepped rack? Locate on SE wall
- Saplings for balusters?
STANTEC / 13.4 / Electrical: Bob Kischko introduces Meagan who will be involved during construction Phase.
STANTEC / 13.5 / Hydro: Bob K to propose engineer within Stantec with appropriate small scale hydro experience - ASAP
13.6 / Next Meeting: Not discussed but we suggest Week of May 29, either Tuesday afternoon or Thursday. Need to have HVAC on menu. Meeting most likely to be at SITE – from now on.
SW