2016Spring Commissioning Service Order-
Please check desired services
Name______Date______Slip #______
Address______City/St______Zip______
Phone (H)______(C) ______email______
Boat Info –Length/Make/Model/Year______
Hull ID #______NJ Reg #______Ins Policy # and ex.______
Engine info/cylinder# ______
Approximate Date Boat requested for Spring Delivery;______
Payment is due at time of work completion. Any unpaid invoices must be paid before Mermaid’s Cove Service will begin commissioning work. If for any reason your invoice is not paid at time of completion Mermaid’s Cove will automatically charge the credit card supplied.
Credit Card Information (required)We accept Visa, Mastercard, Discover, and American Express
Credit Card Type and # ______
Exp. Date______Sec Code______
Services-please check all desired services
Shrink Wrap
_____ Remove shrink wrap only $1.75per foot
_____Remove Shrink Wrap and install covers.
______Up to 27 feet $2.00 per foot
______28 feet and above$4.00 per foot
Painting
____Bottom Painting-our price includes minor scraping, masking and painting (materials notincluded)
____up to 37’ $11.00 per foot
____38’and up $13.00 per foot Paint Preference ______
_____ Scrape, prepare, prime, and paint outdrive(includes materials)$125.00 per drive
# of drives______
______Touchup outboard lower unit-(includes paint) $60.00
*Note: if extra sanding is needed due to heavy marine growth this will be billed at an hourly rate
Cosmetic Maintenance
_____Wash and wax Hull and Topsides (this includes all smooth surfaces of cockpit area)
____Up to 25’ $15.00 per foot
____26’ to $17.00 per foot
_____Wash and wax Hull only (Rubrail and below)
____Up to 25’ $9.00 per foot
____26’ to 42’ $11.00foot
_____Wash and wax Topsides only (Rubrail and above) ____Up to 25’ $9.00 per foot
___26’ to 42’ $12.00 per foot
_____General wash $2.00 per foot
_____Compound Hull (Only done in prior to waxing, not alone) $3.00 per foot
_____Compound Topsides (Only done prior to waxing, not alone) $4.00 per foot
**Compounding done using 3M products and buffing wheel
_____Detail entire vesselestimate given
_____Polish all metals
_____Up to 24’ $90.00
_____25’ to 32’ $120.00 _____33’ and up $150.00
___Reinstall Outdrives (per unit) # of drives______$95.00 per drive
Includes: reinstall, inspect bellows, check gimble bearing, grease bearing, check engine alignment, grease all zirk fittings, visual inspection of trim cylinders, check trim lines and trim position senders
Zincs-all prices are plus materials
_____Install outdrive zincs $45.00
_____Install outboard zincs $45.00
_____Install shaft, rudder and transom zinc $90.00
_____Install trim tab zincs $22.50
_____Install strainer zincs $45.00
Batteries
____Clean, coat, and connect battery terminal of batteries stored aboard
# of batteries_____$22.00 per
____Load test, reinstall battery, clean, coat and connect terminal of batteries stored and trickle charged
# of batteries_____$30.00 per
Engine (Gas)-I/O or Inboard
_____Commission engine-(startup)$45.00
_____Change fuel filters (plus materials)$90.00
_____Remove and replace thermostat (plus materials) $95.00
_____Change transmission oil (plus materials) $115.00
_____Tune up- (price is plus materials)
(includes change spark plugs, distributor cap, rotor, clean flame arrestor or air intake, IAC muffler if applicable, check ignition wires, check belts and hoses)
____8 cyl $270.00
____6 cyl $190.00
____4 cyl $120.00
_____Oil Change (change engine oil and oil filters)(plus materials)
____4 cylinder$75.00 ____6 cylinder $95.00
____8 cylinder$100.00
_____Check props, shafts and bearings and advise of findingsN/C
_____Install engine zinc pencils (plus materials) $45.00
_____Sea Trial- perform sea trial checklist and test all systems$115.00
Diesel Engines
_____Commission engine-(startup)$45.00
_____Change primary and secondary fuel filters-(plus materials)$125.00
_____Clean air filters or air seps (plus materials)$95.00
_____Install new engine zinc pencils (plus materials)$95.00
_____Change transmission oil (plus materials)$115.00
_____Check hoses, belts, clamps & advise of findingsN/C
Outboards
_____Change fuel filters (plus materials)$45.00
_____Change spark plugs (plus materials)$45.00
_____4 stroke- change engine oil and filter (plus materials)$90.00
_____Change lower gear case oil (plus materials) $45.00
Generator
_____Commission generator$45.00
_____Change fuel filters (plus materials)$45.00
_____Change engine oil & oil filter( plus materials)$90.00
_____Change engine zinc pencil (plus materials)$45.00
_____Test output & load test generator$45.00
Water System
_____Commission water system
_____up to 24’$55.00 _____25-30’ $95.00
_____ 31’ & up$125.00
_____Commission head(s) #heads______$25.00 each
_____Commission air conditioning #AC units______$25.00each _____Commission saltwater washdown and baitwell $40.00
_____Clean raw water intake strainers #Strainers______$22.50 each
Miscellaneous-all charged time & materials
_____Check operation of bilge pumps and auto switches
_____Check navigation lights
_____Check shaft seals or stuffing box
_____Check shift operation
_____Check steering systems and oil reservoir
_____Electrical-12 volt & 110 volt
_____Fiberglass repairs
_____Canvas repairs
_____Teak
_____Electronics
Additional work requested
Terms and Conditions
- I hereby authorize the above repair work to be done along with the necessary materials and hereby grant you and/or your employees permission to operate the vessel as necessary for the purpose of testing and/or inspection.
- An express Mechanic’s Lien is hereby acknowledged on the above vessel to secure the amount repairs. Full amount of repairs (parts and labor) must be paid in full prior to the vessel launching by Mermaid’s Cove Service and is due upon completion of work. If for any reason payment in full is not made upon completion of work, I agree that Mermaid’s Cove Marina LLC may charge the full balance to the credit card listed on this work order. I agree to be responsible for all changes incurred unless coverage is obtained from the manufacturer or extended warranty provider. $25 dollar per month late fee on all outstanding balances after 30 days.
- I agree that Mermaid’s Cove Marina LLC is not responsible for any loss or damage to the vessel(s) and/or contents in case of fire, theft, vandalism, or any other cause beyond its control.
- The undersigned customer authorizes the above work to be done, along with the necessary materials, and hereby grants Mermaid’s Cove Service LLC and its employees permission to operate the boat or engine for the purpose of testing and/of inspection.
- Mermaid’s Cove Service is not responsible for loss or damage to articles left on boat.
- Mermaid’s Cove Service is not responsible for fire, weather, theft of or damage to your boat while on our property, including canvas tops and enclosures, whether caused by acts of nature, or negligent or unwillful damage by marina employees or customers.
- Boat Relocation: Owner consents and agrees that the boat yard may move owner’s boat to a different location, berth, or mooring, in the normal course of the boatyard’s business as may be considered necessary. Particularly in the event of inclimate weather such as an impending hurricane.
- Launches will be schedule on a “week of” basis. We will not guarantee any date or time for a launch.
- Insurance: Owner will obtain and pay for general comprehensive public liability insurance insuring MMS as additional named insured and the owner against loss from liability for damaged on account of loss or injury suffered by any person or property within or upon the boat yard, the coverage and protection of such insurance to be in the amount of $1,000,000.00 per incident. Owner agrees to provide MMS with a certificate of insurance and copy of insurance policy confirming the coverage.
- Bottom painting must be performed by Mermaid’s Cove Service personnel or a contractor who hold $2,000,000.00 insurance only. No customers are permitted to bottom paint.
- Mermaid’s Cove Service will not be held responsible for damages to canvas left at the marina.
- I agree to abide by the above terms and conditions and request the above services.
- Parts supplied by owner for installation by Mermaid’s Cove have no warranty/guarantee from Mermaid’s Cove.
- Posted labor rates apply on all hourly charges. 2016 hourly labor charge $115.00 per hour. Some seasonal work may be quoted as flat rate jobs, which include parts and labor.
- Mermaid’s Cove Marina LLC shall be held harmless for all delays in delivery of said vessel due to availability of parts, delivery of parts, weather conditions and all other circumstances beyond its control.
I have read and agree to above terms.