Dwain bercegeay SENIORrov tech/ Supervisor /rigger address 1218 teche rd. Morgan city, Louisiana phone numbers home 985-399-2222 cell 985 -518-3463 e-mail address

Experience

  • Senior Pilot Tech andSupervisorRigger Primary duties including Mobilizations and Operations of 4000 meters 200 hp ROVS
  • Extensive experience in Survey and Construction Projects
  • BOP and Marine Riser Installations.
  • Current Monitoring and Logging.
  • Drill Tool Recovery.
  • Subsea Trees, Electrical and Hydraulic Flying Leads Installation, Jumpers.
  • Pipeline Inspection and lay.
  • Schilling Robotics manipulators and ROV systems product experience.
  • Diamond coated pipeline cutter.
  • Intervention tooling including multi-class torque tools, job-specific tooling, high pressure hot stabs and subsea rigging.
  • Extensive experience in torque tool integration. High pressure hot stabs and installation of subsea jumpers.
  • Installation of TLPS, Trees, PLETS, jumpers and subsea pumps.
  • Cable lay and repairs.
  • Flexible Riser and Z spool and I spool install
  • Pipeline Touchdown monitoring.
  • Removal of munitions Unknown and Live.
  • Survey using Multibeam, Side Scan Sonar, Chirp.
  • 1000 plus hours of flying
  • 19 Jacket inspections with a Oceaneering Magnum
  • Installation of FRSU
  • Two Dam Inspections
  • Trenching and Backfill of Pipelines
  • Dredging out spud cans on Jack Up Rig
  • Install Four GRP Covers and Side Covers
  • Proficient in Schilling New Software HAMMERHEAD
  • Install Compatts for a LBL Array.
  • Install Tree using 15K glycol pump with Torque Toll On a FLOT
  • Also using a Zip Pump all on One ROV

Everything that involves anything about how ROV operates and functions 100%. • Familiarity with an extensive array of Offshore Operations and procedures set as well as diverse subsea control components, tooling and handling equipment to include umbilical’s, EFL, HFL, STFL, Dynamic risers, static flow lines, templates and manifolds, Trees, PLET / PLEM tiebacks and jumpers, umbilical lay etc.

Prided as highly organized with keen ability to prioritize multiple tasks. Capable to complete very demanding and comprehensive projects. Proven leadership and team building skills, adept at interacting with diverse individuals of assorted cultures. Experienced at facilitating communication, cooperation, and adherence to safe working practices for overall client satis-faction and project success.
References;

Mike Fink phone number 1-785-554-1629 e-mail address

Raven DeBeers +27 724 666 912

Arturo Cell number is +393924868906

Eddie Barrett cell number is 806-781-7602

Arthur

Jay Hibbard 1-248-745-8456

Brad Marshall 337-354-6640

Date / Client / Working / Project / Project / Job Task / ROV / Vessel
Depth / Location
June 2001
Pilot Tech / Shell and El Paso / 1450 FSW and 3000fsw / Installation of Brutus and Prince TLP / Green Canyon 158 and Ewing Banks 1003 / Installation on piles and tendons and topside platform / Millieum / Herema
Hermod
October 2002
Pilot Tech / Murphy Exploration & Production Co / 2223 fsw / Installation of subsea modules Medusa Spar / Mississippi Canyon 582 / Installation of trees PLET and jumpers / Magnum / Oceaneering ! and 2
January 2003
Pilot Tech / Dominion Exploration & Production, Inc., / 5610 FSW / Devils Tower Spar / Mississippi Canyon 773 / Installation of trees PLETS and jumpers / Millieum / Oceaneering 1 and 2
07/2004
Pilot Tech / BP / 7905 fsw / Drill Support Installation of BOP and Current monitoring / Green Canyon 699 / Drill support Installation of BOP and Current monitoring / E- Magnum / Deep Water Horizon
05/2005
Pilot Tech / Anadarko / 4589 fsw / Drill support / Gulf of Mexico / Drill support Installation of BOP and current monitoring / Magnum / Ensco 7500
07thru10/2005
Pilot
Tech / Shell / 15 to 250 fsw / Inspection / Gulf of Mexico / Client requests ROV to inspect 19 Platform Visually and with a FMD / Magnum / M/V Oceaneering ONE
11/2006
Pilot Tech / BP King / 5610 fsw / Subsea module installation / Mississippi Canyon 128 and 129 128 and 129 / Installation of subsea pumps, trees and jumpers and removal of concrete coated pipeline. / Perry TXLS 05 / M/V Harvey Discover
01/2007
Pilot Tech / Helix / 2700 fsw / Pipeline lay and Installation of subsea modules / Garden Banks506 / Installation of 8in pipeline including PLETS, 4 Trees and Jumpers / Perry TXLS 23&35 / M/V Intrepid
12/2008
Pilot Tech / Shell / 2200 fsw / Post Ike Hurricane survey / Green Canyon 133 to 128 / Survey existing pipelines and PLETS and Jumpers / Perry XLX 7 / M/V Canyon Island Pioneer
03/2009
Pilot Tech / Hermod / N/A / Install UHD 33 and 45 onto the Balder / N/A / N/A / Schilling UHD
052009
Pilot
Tech / BHP / 1950fsw / Drill Support / Gulf Of Mexico / Trouble shoot TMS electrical problem / UHD
23 / OCEAN DENOMINATOR
08/2009
Pilot Tech / BP / 3400fsw / Install Suction piles / AT 654 / Install Suctions piles and removal of concrete coated pipeline. / Innovator
19 / M/V Manta Ray
12/2009
Senior Pilot Tech / BHP / 6400fsw / Install two trees / GC 356 / Install two trees / UHD 30 and 31 / M/V Olympic Challenger
05/2010
Senior Pilot Tech / BHP / 8000fsw / Install manifolds jumpers EFLS and HFLS / GC 742 and 743 / Install two trees / UHD 30 and 31 / M/V Olympic Challenger
04/2011
Senior Pilot Tech / AT&T / 250fsw to 1500fsw / Lay Cable and Repair / West Coast of USA / Lay Cable and Repair Cable / ST217
SMD Plough / M/V Global Sentinel
09/2011
Senior Pilot Tech / British Gas / 300msw / Torque tool Turning valves / Armada in UK waters / Client request to open valve and look for leak / UHD 60 / M/V Skandi Inspector
10/2011
Senior Pilot Tech / Shell Oil Company / 900msw / Multibeam Survey / Orman Lange In Norwegian waters / Client request To perform Multibeam survey for pre pipe line lay / UHD 60 / M/V Skandi Inspector
11/2011
Senior Pilot Tech / BP / 2000msw / Inspection of Thunder horse / Gulf of Mexico / Client request for inspection of rig which included water jetting of welds and CP reading of numerous places and visual / XLX 59 and 58 / M/V Grant Candies
12/2011 to 1/2012
Senior Pilot Tech / DONG / 2000msw / Install umbilical and L-spool and SSIV and Zed spool / North Sea
Norwegian Waters
Oslevar Project / Client requests to install umbilical and L-spool.SSIV, Zed- Spool and removal of concrete coated pipeline / UHD 58 and UHD 61 / M/V Skandi Skansen
Date / Client / Working Depth / Project / Project
Location / Job Task / ROV / Vessel
2/2012
Senior Pilot Tech / Statoil / 24 to 350 msw / Install pipeline of the coast of
Scotland / North Sea waters / Clients requests follow touch down on pipeline for 26 k / UHD 18 / Highland Rover
4/2012
Senior Pilot Tech / AMC / 350 msw / Install flexible risers on platform / North Sea of the coast of UK / Clients request Install of flexible risers / HD 7 and !0 / AMC CONNECTOR
5/2012
Senior Pilot Tech / Smit / 18 to 125 msw / Removal of munitions live or unknown / Germany of the coast / Client requests removal of live and unknown munitions / HD 18 / MPR 3
7/2012
Supervisor / MMT / 20 to 150 msw / Survey of proposed cable lay / Gulf of Finland / Clients requests survey of proposed cable lay route / Cougar 20 / M/V ICEBEAM
8/14/12
Supervisor / MMT / 50 to 590msw / Survey of proposed cable lay / Norway and Germany / Clients request survey of proposed cable lay route / Cougar02 / M/v Stril Explorer
9/01/12
Supervisor / MMT / N/A / Demob system off of Stril Explorer onto the M/V Franklin / United Kingdom / Demob complete system off of the Stril Explorer and had it up and running at 18 hours on the M/V Franklin / Cougar 02 / M/V Franklin
10/21/12
Supervisor / MMT / 50 to 200 msw / Survey purposed cable lay site / Norway Fiords / Survey purposed cable lay route with multibeam SSS and Chirp / Cougar 20 / M/V Icebeam
31/12/12
Supervisor / MMT / 25 to 800 msw / Survey purposed cable route / Balearic Sea / Survey purposed cable route with multibeam SSS and Chirp / Cougar02 / M/V Franklin
31/03/12
Sub Engineer / DOF / 120 msw / Position sandbags and mattress on flow line / North Sea Norwegian waters / Position sandbags and mattress on flow line / UHD 58 / M/V Skandi Skansen
03/05/13
Supervisor / Bourbon DNT / 800 msw / Vale Ops / Mediterranean Sea / Valve Ops / HD09 / M/V Med Dieci
07/15/13
Supervisor / IKM / 400 msw / Anchor Handling / North Sea / Anchor Handling / Merlin 310 / M/V Siem Aquamarine
12/08/13
Senior Pilot Tech / Reef Subsea / 150msw / Install riser and umbilical to FRSU / Mediterranean Sea / Install riser and umbilical to FRSU / TXLR 07 / M/V Reef Despina
11/20/13
Supervisor / DNT / 800 msw / Vale Ops and Survey / Mediterranean Sea / Valve Ops
And Survey / HD09 / M/V Med Dieci
2/25/14
Senior Pilot Tech / Hibbard / 300 msw / 2 Dam survey in Panama / Dam in Panama / 2 Dam survey with sonar and UT gauge / Mohican 01 / Panama
5/20/2014
Supervisor / Cal Dive / 2872
msw / Setting up Pig launcher using a class 4 torque tool with a class 7torque tool / GOM / Remove pressure cap install
Pig launcher, After they pumped 1500 gallons of salt water at 1500PSI then they ran another pig at 2000 gallons at 2000psi / Comanche 28 / M/V Uncle John
07/01/2014
Sub Engineer / TECHNIP / 200 MSW / Plough 3 pipelines in then backfill / North Sea / Plough 3 pipelines in then backfill / XL45 / M/V Normand Ranger
08/20/2014
Sub Engineer / Swire / 150msw / Dredge spud can of jackup out / North Sea / Dredge spud can of jackup out / HD-20
HD-35 / Seabed Prince
09/21/2014
Sub Engineer / Swire / 300 msw / Install GRP covers on four wells then installed side covers / North Sea / Install GRP covers on four wells then installed side covers / HD-28 HD-23 / Seabed Worker
11/10/2014
Sub Engineer / Mermaid / 2909 msw / Install Compatts for LBL / Gulf Of Mexico / Install Compatts for LBL / XLS-30 / HOS Mystique
12/14/2014
Supervisor / Delta Subsea / 550 msw / Install Tree using 15k glycol and Torque Tool With FLOT and zip pump. / Gulf Of Mexico / Install Tree / HD-17 and HD-27 / HOS Bayou

Specialist training

Rigger Safety, First Aid, CPR, Hazwoper Awareness, Hazcom, Respiratory Protection, Atmospheric Testing, Personal Transfer, LOTO, Confined Spaces, Asbestos Awareness, Blood borne Pathogens, Benzene Awareness, DOT HM 120 Awareness Forklift Safety, Electrical Safety, NORM Awareness Signs and Tags, Walking Working Surfaces. Personal Protective Equipment. I have a TWIC card. I also have High Voltage certification. H2S Certification.