The School District of Palm Beach County s30

The School District of Palm Beach County.SDPBC Project No.CISTERN SYSTEMS.1.1 SECTION INCLUDES.A. Cistern Tanks (Above Grade and Underground).B. Tank Anchoring Hardware.C. Storm Water Cleaning Equipment.D. Cistern Pump Stations.E. Cistern Pumping Systems and Control Panels

Design and Access Statement Template

ROYAL BOROUGH OF KENSINGTON AND CHELSEA.Design and Access Statement template.For applications for planning permission and/or listed building consent.This template can be used to write your design and access statement. It should be used to explain the

Cold Storage Doors Section 08 38 00

Cold Storage Doors Section 08 38 00.Work required under this Section shall include the furnishing of all labor, materials, tools, and equipment necessary to complete all insulated door work as detailed on the drawings and/or as specified herein

Zoning Board of Appeals s8

Zoning Board of Appeals.Applicant Information.A variance is permission to deviate from the requirements of the zoning ordinance. It is the responsibility of the applicant to convince the Zoning Board of Appeals to grant a variance by providing drawings

Outline for Subsystem Specifications s1

Product Specification.Station 1 Field Period Assemblies (S1-FPA).Prepared by: P. L. Goranson, Vacuum Vessel System (WBS 12) Manager.Concurred by: M. Viola, Field Period Assembly Manager.Concurred by: J. Levine, ES&H.Concurred by: J. Malsbury, Quality Assurance

A Typical Zoning Ordinance

A TYPICAL ZONING ORDINANCE.Article I. Purposes.Zoning ordinances often include a statement of purpose, which helps ensure favorable judicial interpretation by stating the zoning policy of the community, although many ordinances for small communities

Corrosion Prevention Assocation

Structural Asset Protection and Repair.Rheged Centre, Redhills, Penrith, Cumbria, CA11 0DQ.Structural Asset Protection and Repair.Rheged Centre, Redhills, Penrith, Cumbria, CA11 0DQ

Building Permit Application s2

Zoning Permit Application.Town of Sheldon.County Office 585-786-3152.1. This application must be completely filled in by typewriter or ink and submitted in duplicate to the Wyoming County Zoning Department or Town Clerk

Section 30-4. Use for Projects with FDR Cement

Section 30-4. Use for projects with FDR cement.1. Insert the minimum 7-day compressive strength, at least 300 psi, that is 50 psi more than the compressive strength used to determine gravel factor in design. Do not specify a minimum greater than 500 psi.Add to the beginning of section 30-4.01D(2)

Wood Ultimate Insert Double Hung

1.1 Section Includes.A. Wood Insert Double Hung, Single Hung, and related picture, transom window complete with hardware, glazing, weather strip, insect screen, removable grille, simulated divide lite, authentic divided lite, grille-between-the-glass

Barton County Zoning Regulations

Barton County Zoning Regulations.PART 1. GENERAL PROVISIONS.12-101. Authority. These regulations, and the districts created under the authority of these regulations, may be amended from time to time by ordinance duly enacted by the Governing Body of the

Contractor Overview Training Slides

Welcome to CPARS Contractor Performance Assessment Reporting System.Contractor Overview.Process Overview.Ratings and Narratives.Contractor Guidance.Past Performance Information Retrieval System (PPIRS).Helpful Hints.Contractor Performance Assessment Reporting System (CPARS)

Non-Residential Construction in I-VI of 2017

Non-residential construction in I-VI of 2017.In the period January-June of 2017, in comparison with corresponding period of the previous year, a growth of non-residential buildings completed was observed, while the number of non-residential buildings

Cmr RFP Bid Form 2013 1115 Final

FROM: Primary Contact: Address: Telephone: Fax: Email.PROJECT: RENOVATIONS / ADDITION TO THE ______LIBRARY FOR ONE SINGLE PHASE PROJECT AS IDENTIFIED IN THE DRAWINGS DATED ______, (PREVIOUSLY IDENTIFIED AS PHASES 1 TO 4 AND ALTERNATE NO.1)

Christine Tetlow

Christine Tetlow.PLANNING COMMITTEE.At the meeting on 26 January 2005, the Committee resolved that a decision be deferred to seek a reduction in the size of the utility/garage side extension, and to enable a Committee site inspection. The site visit took place on 19 February 2005

Natural Resources Conservation Service s66

NATURAL RESOURCES CONSERVATION SERVICE.CONSTRUCTION SPECIFICATIONS.STRUCTURE FOR WATER CONTROL.Owner/Operator.Project Title.Installation shall be in accordance with an approved design and plan. Details of construction shown on the drawings but not included